(a) No disposal areas shall be permitted closer than 1,000 feet to any residence or water supply well, or within 1,000 feet of any residential district. No disposal areas shall be permitted closer than 500 feet to state waters, as that term is defined by O.C.G.A. § 12-7-3(16), as may be amended from time to time, and as determined by the board of commissioners. (b) Any related solid waste handling facility and its accessory structures shall not be located closer than 500 feet from the interior boundary lines, nor 1,000 feet from any residence or water supply well. Where practicable, the solid waste handling facility shall be as close to the center of the subject property as possible and at a lower level than the surrounding terrain to lessen visual and noise impact. The foregoing shall not apply to the municipal solid waste landfill. (c) No disposal area shall interfere with the established natural flow of surface waters to the detriment of or damage to adjoining public or private properties. The board of commissioners shall have the right to require an applicant to construct adequate sediment basins if it appears that substantial water or sediment may be carried into any nearby property or state waters. (d) Hazardous wastes, as that term is defined by O.C.G.A. § 12-8-62(10), as may be amended from time to time, are prohibited. (e) No disposal area shall be located within a seismic impact zone, as that term is defined by the state environmental protection division's Rules for Solid Waste Management, GA. Comp. R. & Regs. R. 391-3-4-.05(1)(g), as may be amended from time to time. (f) Prior to the commencement of the construction of any landfill within the county, the owner/operator of the proposed landfill shall obtain from all state waters and from all water supply wells located within two miles of the boundaries of all property owned by the owner/ operator of the landfill, a water sample, which shall be analyzed for all constituents listed in appendix I and appendix II to 40 CFR part 258, subpart E, as amended, 56 Fed. Reg. 51032-51039 (October 9, 1991), by a properly accredited laboratory approved by the board of commissioners. These samples shall contain the exact location from which they were obtained, the name and address of the property owner who owns the land from which the water sample was taken, and the name and address of the principal user of the water supply well, if different from the owner of the property upon which the well is located. The results of the individual analysis shall be certified by the laboratory, submitted to each property owner from whose property a sample was taken, and filed with the board of commissioners. (g) All wells to be included in the groundwater monitoring program required by the state environmental protection division shall be monitored quarterly for all constituents in appendix I to 40 CFR part 258, subpart E, as amended, 56 Fed. Reg. 51032-51039 (October 9, 1991), and shall be monitored annually for all constituents in appendix II to 40 CFR part 258, subpart E, as amended, 56 Reg. 51032-51039 (October 9, 1991). Copies of all monitoring test well results shall be delivered to the board of commissioners promptly upon receipt by the owner/operator.