--- title: Polk County Code of Ordinances, Sec. 33-6. Water, electrical, and energy standards for data centers collection: local-codes id: local-code:polk-county/code/33-6 cite_as: Polk County, Ga., Code of Ordinances § 33-6 canonical_url: https://georgiacommons.org/counties/polk/code/33-6 md_url: https://georgiacommons.org/counties/polk/code/33-6.md text_url: https://georgiacommons.org/counties/polk/code/33-6/text source_url: https://library.municode.com/ga/polk_county/codes/code_of_ordinances date: 2026-06-02 status: active jurisdiction: county:polk jurisdiction_name: Polk County county_fips: "13233" corpus_version: local-codes-polk-county-734ee1619160 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/polk/code/~chapter-33.md previous: https://georgiacommons.org/counties/polk/code/33-5.md next: https://georgiacommons.org/counties/polk/code/33-7.md index: https://georgiacommons.org/counties/polk.md branch: code edition: As published by Municode, current through 2026-06-02 edition_date_kind: current_through source_publisher: Municode version_id: local-code:polk-county/code/33-6@2026-06-02-613fae7b53 --- # Polk County Code of Ordinances, Sec. 33-6. Water, electrical, and energy standards for data centers > As published by Municode, current through 2026-06-02 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Chapter 33 - DATA CENTERS (a) Prior to issuance of permit, written verification from Polk County Water Authority must be provided to the building inspector confirming the facility will not impair local water supply during droughts or peak demand times. (b) Prior to issuance of permit, written verification from the electrical utility provider must be provided to the building inspector confirming sufficient grid capacity for peak-hour demands, including redundancy for outages. (c) All electrical equipment shall be housed in electrically grounded structures with fire-rated enclosures, with a minimum of 30-minute resistance, and automatic fire baffles. ## History (Res. No. 2026-180, § 1, 3-3-2026)