--- title: Pulaski County Code of Ordinances, Section 5.2.10.3. Testing collection: local-codes id: local-code:pulaski-county/code/5.2.10.3 cite_as: Pulaski County, Ga., Code of Ordinances § 5.2.10.3 canonical_url: https://georgiacommons.org/counties/pulaski/code/5.2.10.3 md_url: https://georgiacommons.org/counties/pulaski/code/5.2.10.3.md text_url: https://georgiacommons.org/counties/pulaski/code/5.2.10.3/text source_url: https://library.municode.com/ga/pulaski_county/codes/code_of_ordinances date: 2023-06-05 status: active jurisdiction: county:pulaski jurisdiction_name: Pulaski County county_fips: "13235" corpus_version: local-codes-pulaski-county-c364c75aa37b publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/pulaski/code/~appendix-a/~chapter-5.md previous: https://georgiacommons.org/counties/pulaski/code/5.2.10.2.md next: https://georgiacommons.org/counties/pulaski/code/5.2.10.4.md index: https://georgiacommons.org/counties/pulaski.md branch: code edition: As published by Municode, current through 2023-06-05 edition_date_kind: current_through source_publisher: Municode version_id: local-code:pulaski-county/code/5.2.10.3@2023-06-05-5115f3f1a8 --- # Pulaski County Code of Ordinances, Section 5.2.10.3. Testing > As published by Municode, current through 2023-06-05 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - SUBDIVISION ORDINANCE / Chapter 5 - CONFORMANCE WITH COMPREHENSIVE PLAN, IMPROVEMENTS REQUIRED, DESIGN AND CONSTRUCTION STANDARDS FOR ALL SUBDIVISIONS / 5.0 - Conformance With Comprehensive Plan and Other Regulations. / 5.2.10 - Construction Methods—Roadways. Prior to construction of the graded aggregate base course, the subgrade compaction shall be tested by the developer and/or design professional of record and witnessed by the County Roads Superintendent or his/her duly appointed representative. Likewise, the compaction of the base course shall be tested prior to the application of Bituminous Plant Mix paving. Compaction testing shall be accomplished by visual inspections of actual live axle loads, commonly referred to as "Roll Test." All compaction tests shall be scheduled with the County Roads Superintendent, or his/her duly appointed representative no less than twenty-four (24) hours in advance. The contractor shall also provide an adequate testing vehicle, minimum eighteen (18) ton hauling capacity, fully loaded. All areas or sections of the subgrade and base course, which do not pass visual live load compaction testing, shall be corrected. Once the contractor makes all necessary corrections, it shall be his/her responsibility to schedule any and all subsequent roll tests.