The ratio for all fill or cut slopes in the public right-of-way and/or slope easements shall not exceed three (3) horizontal units to one (1) vertical unit, unless otherwise approved by the Sole Commissioner based on topographic conditions. This is the maximum allowable slope and should not be considered the norm. If grading plans indicate cut or fill slopes outside of the right-of-way, then the construction plans and final plat shall indicate slope easements for the required grading. All fill slopes created for the purpose of street or home construction shall have a compaction of not less than ninety-five percent (95%) as determined by the established engineering practices. All slopes created or existing within the subdivision or as a result of the subdivision development shall be planted or otherwise protected from erosion and failure.