Reinforced concrete pipe joints must be properly constructed, to prevent exfiltration. The use of O-rings or sealants may be required, depending on pipe design. All storm sewer piping shall be constructed in a linear approach, with no vertical or horizontal variance from the approved design. High-density polyethylene (HDPE) and corrugated metal pipe (CMP) shall be joined by manufacturer's recommended pipe banding materials. All trench lines shall be thoroughly compacted, prior to pipe installation. HDPE pipe will require special bedding and installation as directed by the County Roads Superintendent.