--- title: Pulaski County Code of Ordinances, Section 5.2.8.4. Catch Basins and Storm Sewer Structures collection: local-codes id: local-code:pulaski-county/code/5.2.8.4 cite_as: Pulaski County, Ga., Code of Ordinances ยง 5.2.8.4 canonical_url: https://georgiacommons.org/counties/pulaski/code/5.2.8.4 md_url: https://georgiacommons.org/counties/pulaski/code/5.2.8.4.md text_url: https://georgiacommons.org/counties/pulaski/code/5.2.8.4/text source_url: https://library.municode.com/ga/pulaski_county/codes/code_of_ordinances date: 2023-06-05 status: active jurisdiction: county:pulaski jurisdiction_name: Pulaski County county_fips: "13235" corpus_version: local-codes-pulaski-county-c364c75aa37b publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/pulaski/code/~appendix-a/~chapter-5.md previous: https://georgiacommons.org/counties/pulaski/code/5.2.8.3.md next: https://georgiacommons.org/counties/pulaski/code/5.2.9.md index: https://georgiacommons.org/counties/pulaski.md branch: code edition: As published by Municode, current through 2023-06-05 edition_date_kind: current_through source_publisher: Municode version_id: local-code:pulaski-county/code/5.2.8.4@2023-06-05-274a9ddeba --- # Pulaski County Code of Ordinances, Section 5.2.8.4. Catch Basins and Storm Sewer Structures > As published by Municode, current through 2023-06-05 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - SUBDIVISION ORDINANCE / Chapter 5 - CONFORMANCE WITH COMPREHENSIVE PLAN, IMPROVEMENTS REQUIRED, DESIGN AND CONSTRUCTION STANDARDS FOR ALL SUBDIVISIONS / 5.0 - Conformance With Comprehensive Plan and Other Regulations. All catch basins and storm sewer structures shall be designed and constructed in compliance with GADOT Specifications and shall be GADOT Standard 1033D, 1034D, or 1019. The use of a Standard 1019 shall be excluded from turnarounds and the low point of sag vertical curves draining more than three hundred feet (300') of gutter. Drainage calculations and design data are required for the use of a Standard 1019. All drainage structures shall be constructed of reinforced precast concrete, four-foot (4') diameter or larger. All 1033D and 1034D drainage structures shall require a reinforced precast "Round to Square" adapter, for additional support. All junction boxes shall include precast adapters and heavy-duty traffic rated ring and covers. All junction boxes shall include approved steps, spaced twelve inches (12") o.c. vertically, to allow safe access by maintenance personnel. All storm sewer structures shall be reinforced precast or pored in place reinforced concrete. Masonry structures are not allowed unless authorized in writing by the County Roads Superintendent. No length of pipe shall exceed three hundred feet (300') without intermediate structures. In certain instances where rolled or "Hollywood" curb is utilized, the County Roads Superintendent may require the use of 1033F and 1034F catch basins. All structures shall have poured inverts to minimize accumulation of water and sediment in the structure.