--- title: Pulaski County Code of Ordinances, Section 5.3.10. Installation of Utilities collection: local-codes id: local-code:pulaski-county/code/5.3.10 cite_as: Pulaski County, Ga., Code of Ordinances ยง 5.3.10 canonical_url: https://georgiacommons.org/counties/pulaski/code/5.3.10 md_url: https://georgiacommons.org/counties/pulaski/code/5.3.10.md text_url: https://georgiacommons.org/counties/pulaski/code/5.3.10/text source_url: https://library.municode.com/ga/pulaski_county/codes/code_of_ordinances date: 2023-06-05 status: active jurisdiction: county:pulaski jurisdiction_name: Pulaski County county_fips: "13235" corpus_version: local-codes-pulaski-county-c364c75aa37b publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/pulaski/code/~appendix-a/~chapter-5.md previous: https://georgiacommons.org/counties/pulaski/code/5.3.9.md next: https://georgiacommons.org/counties/pulaski/code/5.3.11.md index: https://georgiacommons.org/counties/pulaski.md branch: code edition: As published by Municode, current through 2023-06-05 edition_date_kind: current_through source_publisher: Municode version_id: local-code:pulaski-county/code/5.3.10@2023-06-05-b309b4b9f9 --- # Pulaski County Code of Ordinances, Section 5.3.10. Installation of Utilities > As published by Municode, current through 2023-06-05 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - SUBDIVISION ORDINANCE / Chapter 5 - CONFORMANCE WITH COMPREHENSIVE PLAN, IMPROVEMENTS REQUIRED, DESIGN AND CONSTRUCTION STANDARDS FOR ALL SUBDIVISIONS / 5.0 - Conformance With Comprehensive Plan and Other Regulations. All utility crossings, service lines, conduit, or other related appurtenances shall be installed within the limits of the roadbed within two feet (2') of each side of the pavement surface, prior to the placement and compaction of the graded aggregate base course. Utilities should be installed following the installation of curb and gutter, unless the curb line is accurately staked at fifty-foot (50') intervals to insure proper utility locations as specified by the Sole County Commissioner. The developer should coordinate the location of all utilities and provide a copy of all as-built and proposed locations with the final plat.