All utility crossings, service lines, conduit, or other related appurtenances shall be installed within the limits of the roadbed within two feet (2') of each side of the pavement surface, prior to the placement and compaction of the graded aggregate base course. Utilities should be installed following the installation of curb and gutter, unless the curb line is accurately staked at fifty-foot (50') intervals to insure proper utility locations as specified by the Sole County Commissioner. The developer should coordinate the location of all utilities and provide a copy of all as-built and proposed locations with the final plat.