Skip to content
Georgia Commons
Menu

Pulaski County · Code of Ordinances

Appendix A - SUBDIVISION ORDINANCE / Chapter 5 - CONFORMANCE WITH COMPREHENSIVE PLAN, IMPROVEMENTS REQUIRED, DESIGN AND CONSTRUCTION STANDARDS FOR ALL SUBDIVISIONS / 5.0 - Conformance With Comprehensive Plan and Other Regulations.

Section 5.4. Utilities.

About this text

  • As published by Municode, current through 2023-06-05
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Utility lines shall be located at such location as may be approved by Pulaski County. Any underground utilities shall be installed with the surface having the same compaction as that of the paved way and marked on the plat to indicate the location of the underground utilities.

The facilities for underground utilities such as sewer, water, and gas, including sewer and water laterals to each lot line when laid in streets, shall be in place prior to surfacing of streets. All facilities for utilities shall be placed in easements provided for that purpose in the subdivision.

The subdivider shall install sewer mains, sewer laterals, water mains and services extended to the property line of each lot, in accordance with accepted engineering practices, the approved subdivision construction plans, and Pulaski County standards when such services are available.

Regardless of whether or not public water and sewer services are available, the minimum lot sizes shall be two (2) acres per single-family dwelling, or in the case of multi-family dwellings, two (2) acres per four

(4) bedrooms.

Design criteria for storm drain facilities shall conform to accepted engineering practices and guidance documents. Pipe materials shall conform to all criteria set forth in the selection "Guidelines for Storm Sewer Piping," incorporated herein.

Site lighting shall be oriented to the interior of the site so as not to impose glare or objectionable light levels on the neighboring residential property.

Where public water service is available, water mains for both domestic use and fire protection shall be properly connected with the public water system, or with an alternate water supply approved by the County and GAEPD. The lines shall be constructed in such a manner as to adequately serve all lots shown on the subdivision plat. The lines shall be installed in conformance with the standards set by the Sole County Commissioner. The County will require network distribution analysis of the water distribution system for any development that the peak hour water demand is equal to or exceeds fifty gallons per minute (50 gpm).

Fire hydrant spacing shall be in accordance with the water specifications of Pulaski County. Placement of fire hydrants is subject to approval by the Pulaski County Fire Department.

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:pulaski-county/code/5.4@2023-06-05-8b890d800e

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Pulaski County Code of Ordinances, Section 5.4. Utilities | Georgia Commons