No streets or roadways shall be accepted by the county unless they are paved at the time of such proposed conveyance to the county, which paving meets the minimum standards as provided for in this article. The entire cost of such construction, grading, drainage, sloping, grassing, engineering, surveying and all other expense shall be at the sole cost and expense of such developer or subdivider.