Drainage easements for improved ditches, pipe construction, and detention facilities shall be cleared, opened, and stabilized with erosion control measures at the time of development to control surface water runoff. Drainage easements shall be provided where a development is transversed by or contains a natural or manmade watercourse, impoundment, detention pond, floodplain, natural stream, or channel. It shall conform substantially to the limits of such natural drainage feature, but shall not be less than twenty feet (20') in width. Drainage easements outside of the street right-of-way shall be clearly defined on the final plat. The property owner will be required to keep the easement free of obstruction in such a way as to assure the maximum designed flow at all times. The property owner shall not alter any drainage improvements without the prior written approval from the County. Drainage easements for storm drain pipes and improved ditches shall adhere to the provisions set forth in Section 5.7.2.