Skip to content
Georgia Commons
Menu

Putnam County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 18 - BUILDINGS AND BUILDING REGULATIONS / Article III - BUILDING PERMITS AND REQUIREMENTS

Sec. 18-71. Building permit required.

About this text

  • As published by Municode, current through 2026-02-17
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, or change the occupancy of a building or a structure, or to erect, install, enlarge, alter, repair, convert or replace any electrical, gas, mechanical, or plumbing system, the installation of which is regulated by the standard building codes, or to cause any such work to be done, shall first make application to the director and obtain the required permit for the work. Any time a new non-residential business is beginning operation in an existing structure, or any time a new tenant is to occupy an existing non-residential structure, such person or entity shall be required to notify the director and obtain an inspection prior to obtaining a business license and/or beginning tenancy (such requirements shall not apply to residential tenants such as apartment renters). It shall be unlawful to commence construction of a building or structure without first obtaining a permit, as required herein. It shall be unlawful to commence any land disturbance activity for the construction of any building; to commence construction of any building; to commence the moving or alteration of any building; or to commence the development of land for a use not requiring a building, until all necessary permits for such work have been issued. Building permits shall be required as listed in this chapter, and land disturbance permits as required by the Putnam County Soil Erosion and Sedimentation Control Ordinance. All land development or construction shall comply with the codes and ordinances in effect in Putnam County at the time the permit is issued. Any building permit shall automatically expire six months from the date of issuance if construction has not begun or has been abandoned. Construction or reconstruction not in compliance with the building permit issued, or without a building permit as required in this section, shall constitute a misdemeanor for which the violator, if found guilty, may be punished as provided by law. Each day upon which a violation continues shall be considered a separate offense under this section.

History

The history line the source prints at the end of the section.

(Ord. of 7-2-2021(1))

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:putnam-county/code/18-71@2026-02-17-541be2d6c8

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.