--- title: Putnam County Code of Ordinances, Sec. 53-5. Solar energy system requirements collection: local-codes id: local-code:putnam-county/code/53-5 cite_as: Putnam County, Ga., Code of Ordinances ยง 53-5 canonical_url: https://georgiacommons.org/counties/putnam/code/53-5 md_url: https://georgiacommons.org/counties/putnam/code/53-5.md text_url: https://georgiacommons.org/counties/putnam/code/53-5/text source_url: https://library.municode.com/ga/putnam_county/codes/code_of_ordinances date: 2026-02-17 status: active jurisdiction: county:putnam jurisdiction_name: Putnam County county_fips: "13237" corpus_version: local-codes-putnam-county-e5ae5a3ca944 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/putnam/code/~part-ii/~chapter-53.md previous: https://georgiacommons.org/counties/putnam/code/53-4.md next: https://georgiacommons.org/counties/putnam/code/53-6.md index: https://georgiacommons.org/counties/putnam.md branch: code edition: As published by Municode, current through 2026-02-17 edition_date_kind: current_through source_publisher: Municode version_id: local-code:putnam-county/code/53-5@2026-02-17-7e19fa515e --- # Putnam County Code of Ordinances, Sec. 53-5. Solar energy system requirements > As published by Municode, current through 2026-02-17 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 53 - SOLAR ENERGY (a) To the extent practicable, and in accordance with Georgia law, the accommodation of solar energy systems and associated equipment, shall be encouraged in the application of the various review and approval provisions of the Putnam County Code of Ordinances. (b) A solar energy system may provide power for the principal use and/or accessory use of the property on which the solar energy system is located but is not required to do so. (c) The installation and construction of a roof-mount solar energy system or buildingintegrated solar energy systems shall be subject to the following development and design standards: (1) A roof, building-mounted, or building-integrated solar energy system may be mounted on a principal or accessory building. (2) Any height limitations of the Putnam County Code of Ordinances shall not be applicable to solar collectors, provided that such structures are erected only to such height as is reasonably necessary to accomplish the purpose for which they are intended to serve. (3) Placement of solar collectors on flat roofs shall be allowed by right, provided that panels do not extend horizontally past the roofline. (d) The installation and construction of a ground-mount or pole-mount solar energy system shall be subject to the following development and design standards: (1) The height of the solar collector and any mounts shall not exceed 20 feet when oriented at maximum tilt. (2) The surface area of a ground- or pole-mounted system, regardless of the mounted angle, shall be calculated as part of the overall lot coverage. (3) The minimum solar energy system setback distance from the property lines shall be equivalent to the building setback requirement of the underlying zoning district. (4) All power transmission lines from a ground-mounted solar energy system to any building or other structure shall be located underground and/or in accordance with the building electrical code as appropriate. (e) The installation and construction of a solar farm or utility-grade solar energy system shall be subject to the following development and design standards: (1) A minimum setback distance of 50 feet from all property boundaries shall be required, with the exception of property boundaries of adjoining parcels that are a part of a single solar farm project, as shown on the site plan. These property boundaries shall not be subject to this setback requirement. In such excepted case, a written waiver approved by the county and signed by the property owner(s) of all adjoining parcels included in the project shall be required. (2) Power inverters and other sound producing equipment shall be no less than 150 feet from any dwelling unit at the time of construction/installation. (3) All solar energy systems shall be completely enclosed with a minimum of six feet high chain link or security fencing as measured from the natural grade of the fencing perimeter. (4) Solar farms shall be constructed with evergreen vegetative screening where existing buffers do not obscure solar energy system perimeters from dwelling units on adjacent parcels at maturity, required vegetative screening shall not be less than 15 feet tall, regardless of line-of-sight. Brightly colored signs no smaller than one foot by two feet shall be posted on the fence, tree or permanent post every 100 feet warning of danger and high voltage. (5) Clearing of natural vegetation shall be limited to that which is necessary for the construction, operation, and maintenance of the ground mounted solar photovoltaic installation and consistent with best practices for the preservation of natural areas or good husbandry of the land or forest. (6) The names of the manufacturers, installers, facility owners, and facility operators, and their addresses and phone numbers shall be posted on the required fencing at each entrance of a solar farm. (7) All electrical interconnection and distribution lines within a solar farm's boundaries, except for power lines that leave the project or are within the substation, shall be underground, unless the county code enforcement department grants a written exception due to severe environmental constraints. (8) Lighting of a solar farm and its accessory structures shall be limited to the minimum reasonably necessary for its safe operation and shall be reasonably shielded from abutting properties. Where feasible, lighting of a solar farm shall be directed downward and shall incorporate full cutoff fixtures to reduce light pollution. (9) All solar farms shall have a written emergency response plan that shall be approved by the county's planning and development office, sheriff's office, fire department, and emergency management agency. Each solar farm shall update its emergency response plan no later than January 1 of each year with a copy provided to all departments and agencies named in this subsection. The emergency response plan shall include the following: a. The phone number, email address, and street address for all manufacturers, installers, owners, and operators; and b. The phone number, email address, and mailing address for a representative of the solar farm responsible for responding to public inquiries; and c. The material safety data sheets that apply to any materials on the solar farm; and d. The clearly marked means and instructions for shutting down the solar photovoltaic installation. (10) Any solar farm that has not been in use for a period of 180 consecutive days for its original purpose as approved by the county code enforcement department shall be deemed abandoned and shall not be authorized to recommence operations until a new application and inspection have been completed. (11) The owners and operators of a solar farm and the owners of any real property on which it is located shall be jointly responsible for maintaining solar energy farm. (12) Permits for solar farms will include a contingent decommissioning plan, as specified in section 53-8. (f) All electrical equipment associated with, and necessary for the operation of solar energy systems shall comply with the following: (1) Electrical equipment shall comply with the setbacks specified chapter 66, Zoning, in the underlying zoning district. (g) Solar panel placement should be prioritized to minimize or negate any solar glare onto nearby properties or roadways. (h) A solar energy system shall not be used to display permanent or temporary advertising, including signage, streamers, pennants, spinners, reflectors, banners, or similar materials. The manufacturers and equipment information, warning, or indication of ownership shall be allowed on any equipment of the solar energy system provided they comply with the prevailing sign regulations. (i) A solar energy system shall not be constructed until a building/zoning permit has been approved and issued. ## History (Ord. of 7-10-2020(1))