Putnam County · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 53 - SOLAR ENERGY
Sec. 53-6. Application for permit, fee, and revocation of permit.
About this text
- As published by Municode, current through 2026-02-17
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Prior to the operation of any solar farms, the applicant shall submit an application for a solar farm permit on the form prescribed by the Putnam County Planning and Development and shall provide proof of compliance with all standards for solar farms outlined in this article. No solar farm shall commence operations until it has been inspected by the building inspector and obtained the permit required by this section.
(b) An application for a solar farm permit shall be accompanied by a comprehensive site plan for the solar farm, which shall include, but not be limited to:
(1) Drawings prepared by a professional engineer licensed to practice in Georgia that clearly illustrate the design of the solar farm;
(2) A project summary;
(3) General procedures for operation and maintenance of the installation;
(4) Measures for maintaining safe access to the installation;
(5) Electrical schematics;
(6) Soil erosion and sediment control;
(7) Landscape plans;
(8) Temporary or permanent roads or driveways;
(9) Grading;
(10) Vegetation clearing and planting and mitigation or screening with vegetation, structures, or fences;
(11) Exterior lighting and any screening.
(c) An application for a solar farm permit shall be accompanied by a decommissioning and restoration plan that describes the anticipated life of the solar project, the parties responsible for the decommissioning and restoration, the estimated decommissioning and restoration costs, the amount by which such costs were reduced due to the recyclable value of any materials, and the method for ensuring that funds will be available for decommissioning and restoration of the real property. The decommissioning and restoration plan must be prepared by a professional engineer duly licensed by the State of Georgia.
(d) An application for a solar farm permit shall be accompanied by a bond ensuring that funds will be available for decommissioning the solar farm and reasonably restoring the site to its natural condition. The bond shall be in the form of cash or surety from a bonding company qualified to transact business in the State of Georgia and acceptable to the Putnam County Board of Commissioners. The bond shall be payable to Putnam County in an amount determined by the county's engineer to be reasonably sufficient to cover removal of the solar farm in its entirety and reasonable restoration of the site to its natural condition. The bond shall be maintained as long as the solar farm exists, regardless of whether it is actively operating. If the bond is not maintained as provided herein, Putnam County may call the bond and use the proceeds to remove the solar farm in its entirety and to reasonably restore the site to its natural condition. The bond may be released or returned when the director of planning and development determines in its reasonable discretion that the decommissioning of the solar farm has been completed in accordance with all applicable ordinances and federal and state laws.
(e) At the time of application, each applicant shall pay a non-refundable permit fee in the amount established by the Putnam County Planning and Development schedule of fees.
(f) A permit may be revoked by the Putnam County Planning and Development for any solar farm which is not in full compliance with this article. Prior to revoking the permit, the Putnam County Code Enforcement Officer shall provide three calendar days' written notice of any deficiencies to the solar farm owner or operator via U.S. Mail, overnight delivery, or hand delivery. If the deficiencies are not corrected within those three days, the director of planning and development or designee may revoke the solar farm's permit and require the solar farm to submit a new application before recommencing operations.
History
(Ord. of 7-10-2020(1))
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.