--- title: Putnam County Code of Ordinances, Sec. 53-8. Abandonment and removal collection: local-codes id: local-code:putnam-county/code/53-8 cite_as: Putnam County, Ga., Code of Ordinances ยง 53-8 canonical_url: https://georgiacommons.org/counties/putnam/code/53-8 md_url: https://georgiacommons.org/counties/putnam/code/53-8.md text_url: https://georgiacommons.org/counties/putnam/code/53-8/text source_url: https://library.municode.com/ga/putnam_county/codes/code_of_ordinances date: 2026-02-17 status: active jurisdiction: county:putnam jurisdiction_name: Putnam County county_fips: "13237" corpus_version: local-codes-putnam-county-e5ae5a3ca944 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/putnam/code/~part-ii/~chapter-53.md previous: https://georgiacommons.org/counties/putnam/code/53-7.md next: https://georgiacommons.org/counties/putnam/code/53-9.md index: https://georgiacommons.org/counties/putnam.md branch: code edition: As published by Municode, current through 2026-02-17 edition_date_kind: current_through source_publisher: Municode version_id: local-code:putnam-county/code/53-8@2026-02-17-d2fde9565b --- # Putnam County Code of Ordinances, Sec. 53-8. Abandonment and removal > As published by Municode, current through 2026-02-17 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 53 - SOLAR ENERGY (a) If a ground-mounted solar energy system is removed, any earth disturbance as a result of the removal shall be landscaped in accordance with Putnam County Code of Ordinance. (b) A ground or pole-mounted solar energy system is considered to be abandoned or defective if it has not been in operation for a period of 180 consecutive days. If abandoned, the solar energy system shall be repaired by the responsible party, as per section 53-7(g), meet federal, state, and local safety standards, or be removed by the owner within the time period designated by the planning director. (c) Utility-grade or solar farm solar energy systems shall be subject to the creation of a decommissioning plan at time of permit approval. This plan shall include, at a minimum: (1) Defined conditions upon which decommissioning will be initiated (i.e. end of lease, safety hazard, etc.); (2) Removal of all non-utility owned equipment conduits, structures, fencing, roads and foundations; restoration of property to condition prior to solar farm development; (3) The timeframe for completion of removal and decommissioning activities; and (4) Signed statement from the party responsible for completing the decommissioning plan acknowledging such responsibility. Upon failure to accomplish the decommissioning plan, the building inspector may take action as authorized in the International Property Maintenance Code. (d) The owners and operators of a solar farm and the owners of any real property on which it is located shall be jointly responsible for the removal of the solar energy system, its equipment and panels, and any appurtenant structures and for restoration of the site to as natural a condition as reasonably possible, all of which must be completed to the reasonable satisfaction of the director of planning and development no later than 90 days after abandonment or closure. No later than 120 days after abandonment or closure, the owners or operators of any such solar farm shall provide written documentation acceptable to the director, demonstrating that the solar panels and related equipment were properly disposed of in accordance with federal, state, and local laws. In addition to all other available legal remedies, including calling the bond required per section 53-6(d) of this section, if the entire solar energy system has not been removed within 90 days after abandonment or closure, Putnam County may remove the solar energy system, its equipment, and panels and any appurtenant structures, and may place a lien for the costs of removal upon the real property on which the solar farm was located. Prior to removing the solar energy system, Putnam County shall provide ten-days' written notice to the owners and operators of the solar farm listed in the emergency response plan required pursuant to section 53-5(e)(9) of this section and the owners of the real property on which the solar farm is located. Said notice shall be provided by personal delivery or certified mail to the last address reasonably known and shall be posted on the property. Any delay by the county in taking action pursuant to this subsection shall not in any manner waive the county's right to take such action. ## History (Ord. of 7-10-2020(1))