Rabun County · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 16 - ENVIRONMENT / Article III - SOIL EROSION, SEDIMENTATION AND POLLUTION / Division 5 - PENALTIES AND INCENTIVES
Sec. 16-248. Stop work orders.
About this text
- As published by Municode, current through 2025-04-22
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) (1) For the first and second violations of the provisions of this article, the director or the local issuing authority shall issue a written warning to the violator. The violator shall have five days to correct the violation. If the violation is not corrected within five days, the director or the local issuing authority shall issue a stop work order requiring that land disturbing activities be stopped until necessary corrective action or mitigation has occurred; provided, however, that, if the violation presents an imminent threat to public health or waters of the state or if the land disturbing activities are conducted without obtaining the necessary permit, the director or the local issuing authority shall issue an immediate stop work order in lieu of a warning.
(2) For a third and each subsequent violation, the director or the local issuing authority shall issue an immediate stop work order.
(b) All stop work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred.
(c) When a violation in the form of taking action without a permit, failure to maintain a stream buffer, or significant amounts of sediment, as determined by the local issuing authority or by the director or his designee, have been or are being discharged into state waters and where best management practices have not been properly designed, installed, and maintained, a stop work order shall be issued by the local issuing authority or by the director or his designee.
All such stop work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred. Such stop work orders shall apply to all land disturbing activity on the site with the exception of the installation and maintenance of temporary or permanent erosion and sediment controls.
(d) Notwithstanding any other provision of this article, any failure of soil erosion, sedimentation and pollution control devices may subject the offender to an immediate citation. In particular, any soil erosion, sedimentation and pollution leaving the property of any person and/or any soil erosion, sedimentation and pollution flowing onto a county road and/or any soil erosion, sedimentation and pollution reaching any stream or flowing water may result in fines as outlined in section 16-250.
History
(Ord. of 4-27-2004, § VII(B))
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.