The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning: Accidental discharge: A discharge prohibited by ordinance, which occurs by chance, and without planning or thought prior to occurrence. Applicant: A person submitting a land development application for approval. Best management practice (BMP): Both structural devices to store or treat stormwater runoff and non-structural programs or practices which are designed to prevent or reduce the pollution of the waters of the State of Georgia. BMP landscaping plan: A design for vegetation and landscaping that is critical to the performance and function of the BMP, including how the BMP will be stabilized and established with vegetation. It shall include a layout of plants and plant names (local and scientific). Buffer: With respect to a stream, a natural or enhanced vegetated area lying adjacent to the stream. Channel: A natural or artificial watercourse with a definite bed and banks that conducts continuously or periodically flowing water. Clean Water Act (CWA): The Federal Water Pollution Control Act (33 U.S.C. 1251 et seq.), and any subsequent amendments thereto. Common plan of development (or larger common plan of development): A contiguous area where multiple separate and distinct construction activities will be taking place at different times on different schedules under one plan of development for sale. Construction sequencing plan: A document noting the sequence of construction and identification of infiltration zones for protection during staged installation of permanent post-construction BMPs to ensure suitable site conditions such as avoiding soil compaction by heavy equipment in areas designated for infiltration BMPs. Detention: The temporary storage of stormwater runoff in a stormwater detention facility for the purpose of controlling the peak discharge. Detention facility: A structure designed for the storage and gradual release of stormwater runoff at controlled rates. Development: New development or redevelopment. Environmental Protection Agency (EPA): Federal Agency charged with over site and protection of human health and the environment. Environmental Protection Division (EPD): A state agency, being a division within the Georgia Department of Natural Resources, charged with protecting Georgia's air, land, and water resources through the authority of state and federal environmental statutes. Erosion sediment and pollution control plan: A plan required by the Erosion and Sedimentation Act, O.C.G.A. ch. 12-7, that includes as a minimum, protections at least as stringent as the State General Permit, best management practices, and requirements in section 306-4(c). Extended detention: The storage of stormwater runoff for an extended period of time. Extreme flood protection: Measures taken to prevent adverse impacts from large low-frequency storm events with a return frequency of 100 years or more. Final stabilization: All soil disturbing activities at the site have been completed, and that for unpaved areas not covered by permanent structures and areas located outside the waste disposal limits of a landfill cell that has been certified by EPD for wasted disposal, 100 percent of the soil surface is uniformly covered in permanent vegetation with a density of 70 percent or greater, or landscaped according to the plan (uniformly covered with landscaping materials in planned landscape areas), or equivalent permanent stabilization measures as defined in the Manual (excluding a crop of annual vegetation and seeding of target crop perennials appropriate for the region). Final stabilization applies to each phase of construction. Finished grade: The final elevation and contour of the ground after cutting or filling and conforming to the proposed design. Floodplain: A floodplain or flood plain or is an area of land adjacent to a stream or river which stretches from the banks of its channel to the base of the enclosing valley walls, and which experiences flooding during periods of high discharge. The soils usually consist of clays, silts, and sands deposited during flood. Flooding: A volume of surface water that exceeds the banks or walls of a BMP, or channel; and overflows onto adjacent lands. Grading: Altering the shape of ground surfaces to a predetermined condition; this includes stripping, cutting, filling, stockpiling and shaping or any combination thereof and shall include the land in its cut or filled condition. Green infrastructure: An interconnected natural system and/or engineered system that strengthens and mimics natural hydrologic functions and processes through the use of plants and soil to slow, filter, evapotranspirate and infiltrate runoff close to its source; or the capture and reuse of runoff. GSMM: The latest edition of the Georgia Stormwater Management Manual, Volume 2: Technical Handbook, and its Appendices. Hotspot: A land use or activity on a site that has the potential to produce higher than normally found levels of pollutants in stormwater runoff. As defined by the stormwater director, hotspot land use may include gasoline stations, vehicle service and maintenance areas, industrial facilities (both permitted under the Industrial Stormwater General Permit and others), material storage sites, garbage transfer facilities, and commercial parking lots with high-intensity use. Hydrology: The scientific study of the properties, distribution, and effects of water as a liquid, solid, or gas on the Earth's surface, in the soil and underlying rocks, and in the atmosphere. Illegal connection: Either of the following: (a) Any pipe, open channel, drain or conveyance, whether on the surface or subsurface, which allows an illicit discharge to enter the county's separate storm sewer system including but not limited to any conveyances which allow any non-stormwater discharge including sewage, process wastewater, and wash water to enter the county's separate storm sewer system, regardless of whether such pipe, open channel, drain or conveyance has been previously allowed, permitted, or approved by an authorized enforcement agency; or (b) Any pipe, open channel, drain or conveyance connected to the county's separate storm sewer system, which has not been documented in, plans, maps, or equivalent records and approved by an authorized enforcement agency. Illicit discharge: Any direct or indirect nonstormwater discharge to the county's separate storm sewer system, except as exempted in section 310-14(a). Impervious surface: A surface composed of any material that significantly impedes or prevents the natural infiltration of water into the soil. Industrial stormwater general permit: The National Pollutant Discharge Elimination System (NPDES) permit issued by Georgia Environmental Protection Division to an industry for stormwater discharges associated with industrial activity. The permit regulates pollutant levels associated with industrial stormwater discharges or specifies onsite pollution control strategies based on Standard Industrial Classification (SIC) Code. Infiltration: The process of percolating stormwater runoff into the subsoil. Inspection and maintenance agreement: A written agreement providing for the long-term inspection, operation, and maintenance of the stormwater management system and its components on a site; or with respect to a land development project, which when properly recorded in the deed records constitutes a restriction or covenant on the title to a site or other land involved in a land development project. Land development application: The application for a land development permit on a form provided by Rockdale County along with the supporting documentation required in section 310-39. Land development permit: The authorization necessary to begin construction-related, landdisturbing activity. Land disturbing activity: Any activity which may result in soil erosion from water or wind and the movement of sediments into state water or onto lands within the state, including but not limited to clearing, dredging, grading, excavating, and filling of land. Land disturbing activity does not include agricultural practices as described O.C.G.A. § 12-7-17(5) or silvicultural activities as described O.C.G.A. § 12-7-17(6) within areas zoned for these activities. Linear feasibility program: A feasibility program developed by Rockdale County and submitted to the Georgia Environmental Protection Division, which sets reasonable criteria for determining when it would be infeasible to implement stormwater management standards for linear transportation projects being constructed by Rockdale County, other local governments, or State agencies. Linear transportation projects: Construction projects on traveled ways including but not limited to roads, sidewalks, multi-use paths and trails, and airport runways and taxiways. Local issuing authority: The governing authority of any county or municipality which is certified pursuant to subsection (a) O.C.G.A. § 12-7-8. Municipal separate storm sewer system (MS4): A conveyance or system of conveyances including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, manmade channels or storm drains, owned or operated by Rockdale County, designed or used for collecting or conveying runoff and is not a combined sewer or part of a publicly owned treatment works. MS4 permit: authorize public entities, such as cities, counties, transportation agencies, and military bases, to discharge pollutants from public stormwater systems to waters of the United [States]. National Pollutant Discharge Elimination System: The NPDES permit program addresses water pollution by regulating point sources that discharge pollutants to waters of the United States. New development: Land disturbing activities, structural development (construction, installation or expansion of a building or other structure), and/or creation of impervious surfaces on a previously undeveloped site. Notice of intent (NOI): A notice of intent form provided by EPD for coverage under the state general permit. Notice of termination (NOT): A notice of termination form provided by EPD to terminate coverage under the state general permit. Nonpoint source pollution: A form of water pollution that does not originate from a discrete point such as a wastewater treatment facility or industrial discharge, but involves the transport of pollutants such as sediment, fertilizers, pesticides, heavy metals, oil, grease, bacteria, organic materials and other contaminants from land to surface water or groundwater via mechanisms such as precipitation, stormwater runoff, and leaching. Nonpoint source pollution is a by-product of land use practices such as agricultural, silvicultural, mining, construction, subsurface disposal and urban runoff sources. Nonstructural stormwater management practice or nonstructural practice: Any natural or planted vegetation or other nonstructural component of the stormwater management plan that provides for or enhances stormwater quantity and/or quality control or other stormwater management benefits, and includes, but is not limited to, riparian buffers, open and greenspace areas, overland flow filtration areas, natural depressions, and vegetated channels. Offsite facility: A stormwater management facility located outside the boundaries of the site that it serves. Onsite facility: A stormwater management facility located within the boundaries of the site that it serves. Open space: Permanently protected areas of the site that are preserved in a natural state. Overbank flood protection: Measures taken to prevent an increase in the frequency and magnitude of out-of-bank flooding (i.e. flow events that exceed the capacity of the channel and enter the floodplain). Owner: The legal or beneficial owner of a site, including but not limited to, a mortgagee or vendee in possession, receiver, executor, trustee, lessee or other person, firm or corporation in control of the site. Person: Any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, city, county or other political subdivision of the State, any interstate body or any other legal entity. Phased construction: Sub-parts or segments of construction projects where the sub-part or segment is constructed and stabilized prior to completing construction activities on the entire site. Pollutant: Anything which causes or contributes to pollution. Pollutants may include, but are not limited to: paints, varnishes, and solvents; petroleum hydrocarbons; automotive fluids; cooking grease; detergents (biodegradable or otherwise); degreasers; cleaning chemicals; nonhazardous liquid and solid wastes and yard wastes; refuse, rubbish, garbage, litter, or other discarded or abandoned objects and accumulations, so that same may cause or contribute to pollution; floatables; pesticides, herbicides, and fertilizers; liquid and solid wastes; sewage, fecal coliform and pathogens; dissolved and particulate metals; animal wastes; wastes and residues that result from constructing a building or structure; concrete and cement; and noxious or offensive matter of any kind. Pollution: The contamination or other alteration of the physical, chemical or biological properties of air or water by the addition of any constituent and includes but is not limited to, a change in temperature, taste, color turbidity, or odor, or the discharge of any liquid, gaseous, solid, radioactive, or other substance as will or is likely to create a nuisance or render such waters harmful, detrimental or injurious to the public health, safety, welfare, or environment, or to domestic, commercial, industrial, agricultural, recreational, or other legitimate beneficial uses, or to livestock, wild animals, birds, fish or other aquatic life. Post-construction stormwater management: Stormwater best management practices that are used on a permanent basis to control and treat runoff once construction has been completed in accordance with a stormwater management plan. Post-development: The conditions anticipated to exist on site immediately after completion of the proposed development. Practicability policy: The policy developed by Rockdale County in accordance with the latest edition of the Metropolitan North Georgia Water Planning District's Policy on Practicability Analysis for Runoff Reduction. Pre-development: The conditions that exist on a site immediately before the implementation of the proposed development. Where phased development or plan approval occurs (preliminary grading, roads and utilities, etc.), the existing conditions at the time before the first item being approved or permitted shall establish predevelopment conditions. Pre-development hydrology: The runoff curve number determined using natural conditions hydrologic analysis based on the natural, undisturbed condition of the site. Previously developed site: A site that has been altered by paving, construction, and/or land disturbing activity. Professional engineer (PE): A person who possesses a current certificate of registration as a professional engineer issued by the Georgia State Board of Registration for Professional Engineers and Land Surveyors. Redevelopment: Structural development (construction, installation, or expansion of a building or other structure), creation or addition of impervious surfaces, replacement of impervious surfaces not as part of routine maintenance, and land disturbing activities associated with structural or impervious development on a previously developed site. Redevelopment does not include such activities as exterior remodeling. Regional stormwater management facility (regional facility): Stormwater management facilities designed to control stormwater runoff from multiple properties, where the owners or developers of the individual properties may assist in the financing of the facility, and the requirement for onsite controls is either eliminated or reduced. Registered land surveyor (RLS): A person who possesses a current license issued by the Georgia State Board of Registration for Professional Engineers and Land Surveyors. Registered landscape architect (RLA): A person who possesses a current license issued by the Georgia Board of Landscape Architects. Regulatory floodplain: Any land area susceptible to flooding, which would have at least a one percent probability of flooding occurrence in any calendar year based on the basin being fully developed as shown on the current land use plan. Rockdale County Separate Storm Sewer System: Any facility designed or used for collecting, treating and/or conveying stormwater located in the unincorporated areas of Rockdale County, including but not limited to highways, county streets, curbs, gutters, inlets, catch basins, piped storm drains, pumping facilities, structural stormwater controls, ditches, swales, natural and manmade or altered drainage channels, reservoirs, and other drainage structures; and which is: 1) not a combined sewer, and 2) not part of a publicly-owned treatment works. Routine maintenance: Activities to keep an impervious surface as near as possible to its constructed condition. This includes ordinary maintenance activities, resurfacing paved areas, and exterior building changes or improvements which do not materially increase or concentrate stormwater runoff, or cause additional nonpoint source pollution. Runoff: The flow of surface water resulting from precipitation. Runoff reduction: The interception, evapotranspiration, infiltration, or capture and reuse of runoff. Single family residence: A building constructed as a stand-alone structure, with its own lot (parcel), intended for one family. Site: An area of land where development is planned, which may include all or portions of one or more parcels of land. For subdivisions and other common plans of development, the site includes all areas of land covered under an applicable land development permit. State general permit: The National Pollution Discharge Elimination System (NPDES) general permit or permits for stormwater runoff from construction activities as is now in effect or as may be amended or reissued in the future pursuant to the state's authority to implement the same through federal delegation under the Federal Water Pollution Control Act (Clean Water Act), as amended, 33 U.S.C. Section 1251, et seq., and subsection (f) of Code Section 12-5-30. State waters (waters of the state): Any and all rivers, streams, creeks, branches, lakes, reservoirs, ponds, drainage systems, springs, wells, and other bodies of surface or subsurface water, natural or artificial, lying within or forming a part of the boundaries of Georgia which are not entirely confined and retained completely upon the property of a single individual, partnership, or corporation. Stormwater better site design practices: Nonstructural site design approaches and techniques that can reduce a site's impact on the watershed and can provide for non-structural stormwater management. Stormwater better site design includes conserving and protecting natural areas and greenspace, reducing impervious cover and using natural features for stormwater management. Stormwater concept plan: An initial plan for post-construction stormwater management at the site that provides the groundwork for the stormwater management plan including the natural resources inventory, site layout concept, initial runoff characterization, and first round stormwater management system design. Stormwater director: The person appointed by the board of commissioners to administer, implement, and enforce the provisions of chapter 310 of the Rockdale County Code of Ordinances. Stormwater director (director): The person appointed by the board of commissioners to administer, implement, and enforce the provisions of chapter 310 of the Rockdale County Code of Ordinances. Stormwater management measure: Any stormwater management facility or structural or nonstructural stormwater practice. Stormwater management plan: A plan for post-construction stormwater management at the site that meets the requirements of section 310-37(d) and is included as part of the land development application. Stormwater management standards: Those standards set forth in section 310-36. Stormwater management system: The entire set of non-structural site design features and structural BMPs for collection, conveyance, storage, infiltration, treatment, and disposal of stormwater runoff in a manner designed to prevent increased flood damage, streambank channel erosion, habitat degradation and water quality degradation, and to enhance and promote the public health, safety and general welfare. Stormwater manager: A person designated by the stormwater director to assist with administrative, implementation, and enforcement duties. Stormwater runoff: Flow along the surface of the ground, resulting from precipitation. Stream protection area or protection area: With respect to a stream, the combined areas of all required buffers and setbacks applicable to such stream. Structural stormwater control: A structural stormwater management facility or device that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow of such runoff. Subdivision: The division of a tract or parcel of land resulting in one or more new lots or building sites for the purpose, whether immediately or in the future, of sale, other transfer of ownership or land development, and includes divisions of land resulting from or made in connection with the layout or development of a new street or roadway or a change in an existing street or roadway. Vegetated green infrastructure: Green infrastructure that uses trees, shrubs, grasses, or other vegetation along with amended or engineered soils to intercept, retain, infiltrate, and evapotranspire runoff. Watershed: The land area that drains into a particular stream. Other terms used but not defined in this article shall be interpreted based on how such terms are defined and used in the GSMM and Rockdale County's MS4 Permit. (Ord. No. 0-2006-32, §§ 1—3, 11-28-2006; Ord. No. 0-2020-17, § 1, 11-10-2020)