(a) Eligibility. If timber harvesting took place on the site within 36 months prior to submitting a preliminary plat or applying for a land disturbance permit or a zoning amendment, no such plat, permit or zoning amendment shall be approved. (b) Erosion control. As per O.C.G.A. § 12-7- 17(6), as amended, Forestry Land Management Practices (including harvesting) are exempt from the Georgia Erosion and Sedimentation Act (GESA). However, "when such exempt forestry practices cause or result in land-disturbing or other activities otherwise prohibited in a buffer, as established in [O.C.G.A.] paragraphs (15) and (16) of subsection (b) of code section 12-7-6, no other land-disturbing activities, except for normal forest management practices, shall be allowed on the entire property upon which the forestry practices were conducted for a period of three years after completion of such forestry practices." (c) Reforestation plan. Clear-cutting or seed tree harvesting a stand of trees for capital gain will only be permitted with a plan for how the area will be reforested. The selected type of harvest shall be listed on the Timber Harvesting Information Form. A reforestation plan, written by a professional forester, must be attached with the timber harvesting packet before a permit will be issued. The reforestation plan must show how the site will be prepared before re-establishing a fully stocked stand. The plan must show types of practices and dates for site preparation and replanting. A fully stocked stand may vary depending on species. For pine species there must be at least 400 trees per acre (TPA) growing freely throughout the harvested areas one year after planting or reseeding is complete. For general hardwood species replanting, a minimum of 150 TPA is required to be considered a fully stocked stand. The landowner must show documentation of reforesting the land within two years after harvesting is complete. If no progress has been completed, property owner will be subject to a three-year moratorium in which no further actions shall be approved on the property including application for a land disturbance permit, a zoning amendment, or the submittal of a preliminary plat. (d) Reforestation. As defined in the "National Management Measures to Control Nonpoint Source Pollution Forestry EPA 841-B-05-001, May 2005," silvicultural practices occur when "...forests are tended, harvested and replaced, usually defined by, but not limited to, the method of regeneration." Reforestation can be accomplished artificially or naturally. Natural regeneration is defined as allowing the crop trees to regenerate an area. The most common methods are coppice, seed-in-place, seed trees, and shelterwood. Artificial regeneration is defined as establishing a new forest by planting seedlings or by direct seeding. (e) Timber harvesting operations. Timber harvesting encompasses several operations for the purpose of this section. In addition to cutting trees, timber harvesting typically includes the layout of access roads, log decks and skid trails. It is in the best interest of everyone involved in forestry operations to properly plan and manage their operations by consistently following Georgia Best Management Practices to prevent any potential water quality problems. Below is a listing of the most common harvesting types used in this region: (1) Clear-cutting a stand of trees is the removal of all (zero to eight trees per acre) merchantable trees on a tract and will only be allowed if a reforestation plan has been developed and included with the timber harvesting packet. The reforestation plan shall demonstrate how the property will be reforested once harvesting is complete. (2) Seed-tree harvest can remove all trees, except eight to 15 uniformly spaced high quality seed producing dominant or codominant trees per acre to naturally re-seed the site after harvest. Seed-tree harvest can only be permitted if a reforestation plan has been developed and included with the timber harvesting packet. The management plan shall demonstrate how the property will be reforested once harvesting is complete. It is crucial to plan the timing of the harvest and to assure adequate seed fall. Prescribed burn and/or light harrow disking the ground after harvest will scarify the soil to ensure a germination of the seed. Seed trees should be selected to provide sufficient seed to achieve a fully stocked stand in the new cohort and ensure the seed trees continued survival and viability at the removal cut. Seed trees shall be selected based on the following key traits: a. Trees with a large crown will maximize seed production due to their greater vigor and large leaf area. b. Trees should be at reproductive maturity with past evidence of good seed production. Past evidence of good seed production is the best way to assure future seed production. c. Trees need to be wind firm. Increased taper is correlated to wind firmness, but may be a less desirable phenotype when managing for poles. d. Trees should have desirable phenotypes, since they are providing seed for the next rotation. e. Their form should be free of defects such as forking, sinuosity, or ramicorns (an excessively large and steeply angled branch that forms a large knot). f. No evidence of serious insect or disease susceptibility should be present. (3) Shelterwood harvest method must leave 21 to 60 dominant or co-dominant seed trees per acre. This harvest is a preferred even-aged natural regeneration system for nonprolific seed producing species and as a visually appealing regeneration system for certain hardwood and conifer species. A shelterwood harvest provides an abundance of seed and shelter for seedlings, as well as residual shade to control weeds. This type of harvest will not require a reforestation plan due to the sufficient stocking density left on site, however, the selected seed trees should be high quality (specimen) specimens so as to provide high quality seeds. (4) Thinning operation means to leave a minimum residual stocking density that has the potential to restore to a closed canopy forest within ten years or have no more than 60 percent of the stand removed. Thinning harvest is intended to improve the overall health and quality of the remaining trees. If specimen trees exist on-site, they should be given prior-ity to be retained over other dominant or co-dominant trees. If the required density is met using nonspecimen trees and specimen trees are found by the director of stormwater management or designee to have been removed, then harvesting operation will not be considered as being for silvicultural purposes. This type of harvest will not require a reforestation plan upon permitting due to the sufficient stocking density left on site. (f) Access roads. Road construction shall be solely for silvicultural purposes. Access roads shall not exceed the typical maximum allowable width of 16 feet or should not be wider than necessary for the transport of silvicultural products or access for forest management activities. Roads wider than 16 feet will only be allowed upon director of stormwater management or designee approval. In general, tree stumps are only removed to construct access roads and log decks. The presence of intensive mechanical site preparations such as sheering, root raking, windrowing debris or "stumping" of the site may be deemed as nonsilvicultural activities. (g) GFC consulting. The Georgia Forestry Commission may be contacted by the director of stormwater management or designee if technical assistance is required to determine if a land disturbing activity is a legitimate silvicultural activity exempt from Georgia Erosion and Sediment Control Act O.C.G.A. § 12-7-17, local erosion and sedimentation control ordinances, and permit requirements. The decision rendered by GFC shall be considered final. (h) Bonding. All timber harvesting operations of areas larger than five acres shall be required to obtain a valid surety bond, executed by a surety corporation authorized to transact business in this state, protecting the county against any damage caused by such operations in an amount specified by the department not exceeding $5,000.00. Alternatively at the option of the person or firm harvesting timber, a valid irrevocable letter of credit issued by a bank or savings and loan association, as defined in O.C.G.A. § 7-1-4, in the same amount of and in lieu of such bond may be submitted. For purposes of this paragraph, any such surety bond or letter of credit shall be valid only for the calendar year in which delivered. (i) Additional requirements. The following practices shall be required of all timber cutting incidental to development. (1) All access onto public roads shall have culverts and stone pads as prescribed in the Manual of Standards and Specifications for Georgia Erosion and Sediment Control Act. (2) Stream sides and access roads shall be seeded upon completion of harvesting operations as prescribed in the Manual of Standards and Specifications for Georgia Erosion and Sediment Control Act. (j) Additional requirements. The following practices shall be required of all timber harvesting for silviculture: (1) All such operations shall follow the latest version of Georgia's Best Management Practices for Forestry, available from the Georgia Forestry Commission. (2) All persons or firms harvesting standing timber for delivery as pulpwood, logs, poles, posts, or wood chips to any wood yard or processing plant shall provide notice of such harvesting operations by completing and submitting the harvesting package provided by the county prior to cutting any such timber. (3) Prior written notice shall be required of any person or firm harvesting such timber for each separate tract to be harvested thereby. a. Such notice shall be submitted on a form provided by the Georgia Forestry Commission and shall consist of: 1. A map of the area which identifies the location of the tract to be harvested, the route trucks will be traveling to and from such tract for purposes of pickBUFFERS, ing up and hauling loads of cut forest products, and the main and secondary (if any), points of ingress/egress to such tract from a public road(s). The map shall also include all areas harvested, all stream crossings and all loading decks; 2. A statement as to whether the timber will be removed pursuant to a lump sum sale, per unit sale, or owner harvest for purposes of ad valorem taxation under state law; 3. The name, address, and daytime telephone number of the timber seller if the harvest is pursuant to a lump sum or per unit sale or of the timber owner if the harvest is an owner harvest; and 4. The name, business address, business telephone number, and nighttime or emergency telephone number of the person or firm harvesting such timber; b. Such notice may be submitted to the department in person, by facsimile, or by mail. c. Such notice shall be effective for stated harvesting operation on such tract upon receipt by the department and compliance with all of the requirements stated above. Notice will be active until such notice has completed the harvesting operation for such tract or one year has expired. Any subsequent change in the facts required to be provided for purposes of such notice shall be reported to the department within three business days after such change. d. Violation of the notice requirements in this subsection shall be punishable by a fine not to exceed $500.00. (Ord. No. 0-2008-19, § 2, 11-25-2008; Ord. No. 0-2015-01, § 1, 2-10-2015; Ord. No. 0-2015-12, §§ I, II, 12-8-2015; Ord. No. 0-2016-03, § XX— XXII, 4-26-2016; Ord. No. O-2025-22, 9-9-2025)