Sec. 332-16. Drainage system requirements.
About this text
- As published by Municode, current through 2026-01-27
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Drainage improvements required. Drainage systems may include, but are not limited to, culverts, storm sewer piping, catch basins, drop
inlets, junction boxes, headwalls, gutter, swales, channels, and ditches, shall be provided for the protection of public right-of-way and private properties adjoining project sites and/or public rightof-way. Drainage systems that are designed to carry runoff from more than one parcel, existing
or proposed, and the public right-of-way, shall meet the requirements of these regulations.
(b) Standard specifications. Unless otherwise specifically set forth herein, all of the materials, methods of construction and workmanship for the work covered in reference to drainage system construction shall conform to the most recent standard specifications of the GDOT "Standard specifications, construction of transportation systems," latest edition, and any amendments thereto.
For roads constructed with public funds, either wholly or in part, or for roads classified as principal arterials, minor arterials, or collector streets, materials that meet the GDOT design standards
shall be used, unless an alternative is specifically approved by the department.
(c) All drainage structures shall be constructed in accordance with the GDOT's current standard details.
( d) Design criteria - general.
(1) All drainage system design calculations shall be certified by a registered professional engineer or landscape architect, licensed in the State of Georgia.
(2) The methods utilized in calculating stormwater runoff and peak flows from any drainage basin or basins, shall be appropriately selected based on the relative size of each basin and best engineering practice for recommended hydrologic methods and basin size limitations. See
"Table of Recommended Hydro logic Methods."
Table of Recommended Hydrologic Methods Method Basin Size Limits Rational 0-25 acres scs 0-2,000 acres USGS 25 acres-25 square miles Note: For estimating peak flows only.
(3) All portions of a drainage system, which drain areas falling within a specific category above, shall be analyzed using the same methodology.
(4) Runoff coefficients used for the rational method and runoff curve numbers used for the SCS method shall be consistent with those shown in the "Georgia Storm Water Management Manual," latest edition.
(5) Culverts carrying live streams shall extend to where the crown of the pipe intersects the roadway slope. Pipes that do not carry live streams shall extend at least 50
feet beyond the front building setback lines and may be required to extend farther, where necessary to provide an adequately protected building site on the property. The length requirement, however, shall be subject to requirements for maintaining stream buffers in accordance
with Georgia law or county regulations.
(6) No drainage system piping shall be installed beneath or within the load bearing soil strata supporting any building or
structure.
(e) Design criteria -cross drain culverts (Streams or major drainage channels).
(1) Cross drain culverts or pipe systems designed to convey water from one side of a public right-of-way to the other shall be
designed to pass the fully developed peak flow associated with a 100-year storm, with at least 1.5 feet of free board between the 100-year ponding elevation and the centerline of the road, without raising the 100-year flood elevation on upstream properties. Fully developed flows shall be based on the future land use plan adopted by the
board of commissioners. See chapter 320 for more information.
(2) The 100-year ponding limits at and upstream of the culvert shall be shown on the development plans and on the final
plat (if applicable).
(3) The minimum allowable culvert diameter shall be 18 inches. Culvert design shall include a thorough analysis of both inlet and outlet control conditions.
(f) Design criteria-longitudinal storm sewer piping.
(1) The preliminary design (initial pipe sizing and profile design) of longitudinal pipe collection systems shall be based
upon conveyance of the peak flows associated with a fully developed 25-year storm with the hydraulic grade line (HGL) being
one foot or more below the top of each structure, gutter line or proposed final ground surface elevation, whichever is lowest. All longitudinal piping within a Federal Emergency Management Agency (FEMA)-identified floodplain shall be sized to adequately convey the 100-year frequency storm event.
(2) The minimum allowable pipe diameter shall be 18 inches.
(3) Storm sewer inlets or catch basins shall be provided and spaced so that the gutter spread for a ten-year design flow shall not exceed the following, as measured from the face of the curb:
a . Four feet or less based on the requirements of the GDOT Drainage Manual, if the street is classified as a principal arterial or minor arterial.
b. Six feet, if the street is classified as a collector street.
c. Fourteen feet at any given section, but in no case greater than eight feet on one side of the street, if the street is classified as a local street.
(4) Gutter spread calculations shall be included in the hydrology study and on the development plans.
(5) Complete pipe sizing, flow, velocity and hydraulic grade line computations shall be provided for all portions of a piped collection system. Hydraulic grade lines shall be shown on the storm drainage profiles contained with the development plans for the 25-year storm. A storm drainage pipe chart shall be provided with the construction drawings showing pipe identification, type, size, length, Qdesign, Q max, HGL at each end and velocity at the
discharge point.
(6) Where open drainage channels are proposed, flow, typical sections, velocity and specifications for non-erodable linings shall
be provided. Calculations are to be based on the 25-year storm event.
(g) Energy dissipation - piped systems and culverts.
(1) Energy dissipation devices, such as splash pads, rip-rap, stilling basins, etc., shall be provided at the outlet of every culvert and piped collection system. Outlet protection shall be in accordance with the "Manual for Erosion and Sediment Control in Georgia," latest edition and Georgia Stormwater Management Manual.
(2) Energy dissipation devices shall be located entirely within the project site, no closer than 20 feet from any property line,
and shall not encroach upon any required buffer.
(3) When uniform, graded stone rip-rap is used for energy dissipation, ultraviolet resistant filter fabric (200-pound test) shall be used between the stone layers.
(h) Pipe material specifications. Pipe materials shall be provided in accordance with the Selection Guidelines for Storm Sewer Piping, based on application, traffic and flow conditions (See Standard Design and Construction Details).
(1) Corrugated steel pipe and pipe arches shall conform to the requirements of AASHTO M-36, and shall be Aluminized Type II.
a. Aluminized Type II coated steel pipe shall comply with AASHTO M-274 for coating requirements and AASHTO M-36 for the pipe fabrication
b. No corrugated steel pipe may be utilized in a flowing stream application.
c. The gauge, diameter, and corrugation configurations for corrugated steel pipe and pipe arches shall be in
accordance with GDOT Standard 1030-D.
d. Each end of each pipe section, to be joined by a coupling band, shall have a minimum of two annular corrugations. Coupling bands shall be so constructed as to lap on an equal
portion of each of the pipe sections to be connected. The connecting bands shall have a minimum of four annular corrugations and shall fully engage, over the entire pipe periphery, two corrugations on each pipe end.
Bands shall be fabricated from the same material as is the pipe, and the gauges shall be as specified in section 9.2 of AASHTO M-36.
e. Gaskets may be required, as determined by the county inspector in the field, and shall be either sleeve type
or O-ring type, and shall meet the requirements for gaskets as specified in section 9.3 of AASHTO M-36.
f. Corrugated steel pipe shall not be laid at slopes of less than one percentage of paved invert.
(2) Reinforced concrete pipe joints shall be not less than eight feet in length, unless approved by the director for the installation of very large diameter pipe. All joints shall be bell and spigot-type, using an
O-ring gasket conforming to ASTM C-443.
Pipe shall be manufactured in accordance withAASHTO M-170 and/or ASTM C-76.
Class of pipe and wall thickness shall be in accordance with GDOT 1030-D.
(3) Corrugated aluminum alloy pipe shall comply with AASHTO M-196 for material and fabrication.
a. The gauge, diameter and corrugation configurations for corrugated aluminum alloy pipe and pipe arches shall be in accordance with GDOT
Standard 1030-D.
b. Each end of each pipe section, to be joined by a coupling band, shall have a minimum of two annular corrugations. Coupling bands shall be so constructed as to lap on an equal
portion of each of the pipe sections to be joined. The connecting bands shall have a minimum of four annular corrugations and fully engage, over the entire pipe periphery, two corrugations on each pipe. Bands shall be fabricated from the same material
as the pipe. The minimum band gauges for aluminum alloy pipe shall be as specified in AASHTO M-196, Section 19.
c. Gaskets may be required, as determined by the county inspector in the field, and shall be either sleeve-type
or O-ring-type and shall meet the requirements for gaskets published byAASHTO.
(4) Structural plate drainage structures shall conform to the following specifications:
a. Corrugated steel structural plate pipe, pipe arches and arches shall consist of galvanized plates, bolts and nuts of the size, shape and thickness as shown on the approved plans. These structures shall conform to the requirements of AASHTO M-167.
b. Corrugated aluminum alloy structural plate pipe, pipe arches and arches shall consist of aluminum
plates and galvanized bolts and nuts of the size, shape and thickness as shown on the approved plans. These structures shall conform to the requirements of AASHTO M-219.
(5) Corrugated high-density polyethylene pipe
- Smooth lined Type "S".
a . This specification is applicable to nominal sizes 18 inches in diameter or larger. Requirements for test methods, dimensions and markings of pipe sizes 18 through 36 inches in diameter are those found in AASHTO Designation M-294. HDPE pipe manufacturers shall be approved by the GDOT. HDPE pipe larger than 36
inches in diameter shall be subject to approval by Rockdale County.
b. Pipes and fittings shall be made of polyethylene compounds that meet or exceed the requirements of Type III, Category 4 or 5, Grade P33 or P34, Class C per ASTM D-1248, with the applicable requirements defined in ASTM D-1248. Corrugated fittings may be either molded or fabricated by the manufacturer. Fittings supplied by manufacturers other than
the supplier of the pipe shall not be permitted without prior approval from Rockdale County.
c. Joints shall be made with split couplings, corrugated to engage the pipe corrugations, and shall engage a minimum of four corrugations, two on each side of the pipe joint. Where
required by Rockdale County, a neoprene gasket shall be utilized with the coupling to provide a soil-tight
joint. Gaskets shall conform to ASTM F-477.
d. Installation shall be in accordance with ASTM Recommended Practice D-2321 or as specified by Rockdale County. Certification from the manufacturer that the product was manufactured, tested and supplied in accordance with this specification
shall be furnished to Rockdale County upon request.
(i) Pipe installation standards. Reinforced concrete pipe, corrugated steel and aluminum alloy pipe shall be bedded and backfilled in the same
manner. Corrugated high-density polyethylene pipe shall be bedded and backfilled in accordance with the GDOT Standard Specifications. In addition, prior to approval of a final plat, the county may require the submittal of certification from a mandrel testing agency indicating that any HOPE pipe installed does not exceed 5.0 percent deflection.
(1) Pipe bedding. All piping and structures shall be placed on stable earth, fine granular foundation, or rock backfill, the characteristics of which would be expected to provide long-term stability and allow for
the pipe to be laid accurately. In all live stream pipe installations, in areas oflowbearing solid or non-uniform foundations, in areas where rock is encountered at the
foundation level or in other locations where conditions warrant, a minimum of six inches of crushed stone bedding is required, (maximum size of stone shall be :¼-inch). Geo-textiles or geo-grids also may
be required by the county inspector in unstable materials.
(2) Backfilling. Backfill on all pipe installations shall be constructed using rock backfill material, as specified in GDOT
Standards 812.01 and 812.02, respectively. These materials shall be placed in layers of not more than six inches loose.
Compaction of these materials shall be accomplished by hand tamping or machine tamping. Required compaction levels are as follows:
a. Backfill within all street rights-ofway shall be compacted to 98 percent maximum.
b. Backfill in all other areas shall be compacted to 95 percent maximum density, tested using the AASHTO Method T-99.
(3) Construction loads and minimum cover.
The minimum cover for any pipe or culvert shall be two feet. Minimum cover shall be measured from sub-grade elevations, to ensure adequate pipe protection from construction loads.
(4) Inspection of pipe installation. All pipe shall be installed in a straight approach in strict accordance with the lines and grades shown in the approved construction drawings. The county inspector shall provide periodic inspections of all drainage system installation, to insure compliance with these regulations. No cross drain piping or piping under the proposed paved
surface shall be completely backfilled prior to the inspection of all pipe joints, bedding, initial backfill and compaction up to the pipe center line. A final inspection and
approval of all pipe installation shall be required at the completion of construction activities, and prior to final plat approval.
G) End finish. Headwalls or other end treatments are required on all culverts (except under residential driveways) and at the outlet of all
piped collection systems.
(1) Headwalls shall be pre-cast concrete or poured-in-place, with adequate steel reinforcement and concrete footings. Headwalls shall be required at any pipe inlet where
erosion protection and slope stabilization is required.
(2) Flared end sections shall be concrete or aluminized coated metal only, in accordance with GDOT Standard 1120. Tapered end cuts on metal pipe may be permitted in lieu of flared end sections, at
the discretion of the department.
(3) Safety end sections shall be concrete in accordance with GDOT Standard 1122.
(k) Junction boxes and catch basin.
(1) General requirements. Ajunction box, catch basin or other approved drainage strucSupp. No. 6 CD332:27 ture shall be provided at all points where a change in the horizontal or vertical alignment of any pipe segment occurs, or at intervals not to exceed 300 feet. The change in directional flow in any junction box or catch basin shall not be greater than 90 degrees.
(2) Junction boxes, catch basins, inlets and all other accessible drainage structures shall be constructed of pre-cast, reinforced concrete, minimum four feet in diameter or larger. Structures shall be
properly sized (diameter) and pre-cored (inlets and outlets) based on the diameter(s) of piping to be connected. All precast drainage structures with a finished depth greater than four feet shall be provided with accessible polypropylene composite steps spaced at not more than 12 inches vertically on center. All pre-cast
drainage structures shall include a metal ring and cover, to provide access for maintenance personnel. Junction boxes shall require a Standard 310 (traffic rated) ring
and cover, which shall either be cast in or grouted to the cone section.
(3) Catch basins shall be constructed in accordance with GDOT Standards 1033D (Single Wing) or 1034D (Double Wing). All
catch basins located along the radius of any cul-de-sac shall be constructed in accordance with GDOT Standard 1033F or 1034F (Offset). Catch basins shall require a reinforced pre-cast "round-tosquare" adapter set at a depth of not less than six inches below the gutter elevation, to provide additional gutter clearance and throat support. The throat and top of each catch basin shall be cast-inplace, and the edge of the top facing the travel lane shall include chamfered edges
to prevent possible tire damage. The vertical opening of any catch basin, measured at the gutter line, shall not be less than 5½ inches or greater than eight
inches. Each catch basin top shall include a metal ring and cover (Standard 1033) to provide access for maintenance personnel.
(4) Curb inlets. The use of hood and grate curb inlets, in accordance with GDOT Standard 1019, may be used along curb radii less than 25 feet, but shall not be used in any cul-de-sac turnaround or at the low point of any sag vertical curve draining more than 300 linear feet of road surface.
(5) Finish. Drainage structures shall be set at the proper location and installed plumb.
The tops of all drainage structures shall match final grade. The pipe end at the connection to any drainage structure shall not extend more than six inches past the interior wall of the structure, when measured at the centerline of the pipe. All pipe end connections shall be adequately
sealed with a non-shrink grout. Both sides of pipe shall be grouted (inside and outside) for erosion and sediment control and to ensure complete seal of structure. All
sediment and debris shall be removed from each structure prior to final inspection and approval. All drainage structures that are damaged during construction activities shall be repaired and or replaced, at the discretion of the county inspector.
(I) Special structures. The use of special structures such as natural bottom arches and box culverts, are subject to the review and approval of
the director. Special structures may be permitted in accordance with the latest "Georgia Department of Transportation, Standard Specifications, Construction of Transportation Systems," latest
edition. Additional fees for review and inspection may be charged to the developer. In addition, a separate maintenance bond may be required for the approved special structure.
(m) Drainage ditches and swales.
(1) Ditches, swales or channels shall be designed and constructed to convey at least the fully developed 25-year storm, with
freeboard equal to 20 percent of the design flow depth, or one foot, whichever is greater. All channels that lie within a
FEMA-indicated floodplain shall be designed to adequately convey the 100-year frequency storm event.
(2) Transition channels shall be provided at the inlet and outlet ends of all culverts and pipe systems, unless otherwise provided herein.
(3) The maximum flow rate and velocity at the project site's downstream property line shall not exceed the pre-developed flow rate and velocity.
( 4) In cases of potential erosion due to irregular channel alignment, extreme velocities or excessive slopes, a paved ditch or concrete valley gutter may be required.
However, if, in the opinion of the director, the expected long-term maintenance of an open or surface drainage system could prove impractical; a closed or piped drainage system design may be required.
(5) The cross-sectional shape of channels shall be as found in the standard design and construction details. "V"-shaped cross sections are not permitted in grassed channels.
(6) If the channel will be affected by backwater from culverts, bridges, other structures or floodplains; backwater curves shall be shown in profiles of the channel.
(7) Construction standards. Ditches and channels shall be constructed to the line, grade and cross section specified on the approved plans and shall be free of gullies or other irregularities. Protective cover in
grassed channels shall be installed as soon as practical, to prevent possible erosion. All ditches or channels constructed in fill material shall be lined with appropriately sized coarse aggregate or other approved materials, based on design velocities.
(n) Easement requirements.
(1) Easements, where required shall have a minimum width of ten feet on either side of the lot line where pipes outlet between lots.
(2) Drainage easements for improved ditches, pipe construction and detention facilities shall be cleared, opened and stabilized at the time of development to control surface water run-off. Easements may not have a cross slope greater than 4:1 (horizontal:vertical).
(3) Run-off slope and side slopes are to be specified by the developer's engineer, according to good engineering practice. Drainage easements shall be provided according to the minimum requirements found in the "Table of Easements for Storm
Drain Pipes and Systems" and shall conform to county standards.
Table of Easements for Storm Drain Pipes and Systems Minimum Easement Diameter of Pipe Width 18 inches to 36 inches 20 ft.
42 inches to 72 inches 25 ft.
Over 72 inches 30 ft.
Multiple Pipes Standard width plus ten feet Improved Ditches/Nat- 20 feet + width at top ural Watercourses of ditch
* Additional width may be required by the director for deep installations ( 4) Where a subdivision is traversed by a
stream or other state waters, a stream buffer is required in conformity with subsection 306-4(c)(15).
(5) Where a subdivision is traversed by a drainage way or channel other than state waters there shall be dedicated an access and maintenance easement measuring not less than 20 feet in width or at least ten feet on each side of the top of bank, whichever is greater.
History
(Ord. No. 0-2006-32, §§ 1-3, 11-28-2006)