(a) Subdivision and manufactured home park water supply. Connection to a public water supply system shall be required if available within 1,500 feet of the proposed subdivision or manufactured home park. (b) Subdivision and manufactured home park percolation tests. Where required for planning purposes and determination of the general absorptive capacity of soils, the number of percolation tests to be made shall be one per lot, in the area where absorption fields are to be located. Before construction of on-site sewage management systems, individual lots within the proposed development shall comply with section 50-84. (c) Subdivision and manufactured home park test bores. Where required for planning purposes, test bores to determine groundwater elevations and subsurface rock formations shall be made at locations, in numbers and at depths to be determined by the department or county board of health.