--- title: Rockdale County Code of Ordinances, Sec. 98-119. Wastewater construction requirements collection: local-codes id: local-code:rockdale-county/code/98-119 cite_as: Rockdale County, Ga., Code of Ordinances § 98-119 canonical_url: https://georgiacommons.org/counties/rockdale/code/98-119 md_url: https://georgiacommons.org/counties/rockdale/code/98-119.md text_url: https://georgiacommons.org/counties/rockdale/code/98-119/text source_url: https://library.municode.com/ga/rockdale_county/codes/code_of_ordinances date: 2026-01-27 status: active jurisdiction: county:rockdale jurisdiction_name: Rockdale County county_fips: "13247" corpus_version: local-codes-rockdale-county-c3e0b855bd42 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/rockdale/code/~part-ii/~part-a/~chapter-98/~article-iii/~division-3.md previous: https://georgiacommons.org/counties/rockdale/code/98-118.md next: https://georgiacommons.org/counties/rockdale/code/98-120.md index: https://georgiacommons.org/counties/rockdale.md branch: code edition: As published by Municode, current through 2026-01-27 edition_date_kind: current_through source_publisher: Municode version_id: local-code:rockdale-county/code/98-119@2026-01-27-d0ef6614bc --- # Rockdale County Code of Ordinances, Sec. 98-119. Wastewater construction requirements > As published by Municode, current through 2026-01-27 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Part A - GENERAL ORDINANCES / Chapter 98 - UTILITIES / Article III - WASTEWATER SYSTEM / Division 3 - CONSTRUCTION STANDARDS (a) Construction procedures. The following are construction procedures for wastewater connections: (1) All pavement cuts shall be made by sawing prior to excavation to eliminate uneven and ragged edges. (2) All backfill beneath roads, sidewalks or other paved areas shall be compared to 95 percent standard proctor using mechanical tamping equipment in six-inch lifts. It shall be the responsibility of the person making the wastewater connection to demonstrate to the director or his designated representative that 95 percent compaction has been obtained. (3) All road cuts shall have an eight-inch thick concrete cap (3,000 psi in 28 days) which shall extend not less than 12 inches beyond the edges of the backfilled ditch. (4) Final asphalt patches shall match the existing pavement type, quality and thickness as closely as possible. Special care shall be exercised to match the existing slopes and grades for a smooth transition. (b) Inspection of connections by the county. The applicant for a sewer service lateral connection permit shall notify the director when the sewer service lateral is ready for inspection and connection to the county wastewater system. The connection and testing shall be made in the presence of the director or his designee. (c) Guarding excavations. All excavations for sewer service lateral installation shall be adequately guarded with barricades and lights in compliance with all OSHA and State of Georgia Department of Transportation requirements so as to protect the public from hazard. Streets, sidewalks, parkways and other public property disturbed in the course of the work shall be restored to a good as new condition in a manner satisfactory to the county. ## History (Ord. No. 2007-07, § 1, 3-27-2007)