(a) All wastewater construction work conducted on the public right-of-way or any public property shall be conducted only with proper permission from the director. (b) All disturbed areas as a result of such construction shall be restored to a condition that is as good as new. The scheduling of such construction activities shall be as approved by the director if such scheduling approval is determined to be in the public's best interest.