A master plan for wastewater facilities shall be prepared by Rockdale Water Resources. Such master plan shall be reviewed and comprehensively updated as circumstances require or as directed by the director. Projected flows and recommendations contained in the master plan shall be consistent with the county comprehensive land use plan, available and accurate regional forecasts of population and employment, and any project specific information which is available at the time the plan is developed or updated. Water resources shall periodically compare flows being treated at the wastewater treatment facilities with the permitted capacities of the treatment facilities and shall project flows in each drainage basin over the following ten-year period. When these projections indicate that total flow will likely equal or exceed 85 percent of total authorized flow within the following five years, water resources shall prepare and submit to the board of commissioners for their review and action recommendations for expansion, and a detailed schedule including planning, design, permitting, construction and startup of needed proposed facilities.