(a) All nondomestic users shall, upon the request of the county, complete and submit to the county a wastewater questionnaire. The wastewater questionnaire shall be on a form provided by the county and shall be used for the purpose of determining whether the industry is a significant contributing industry and for other purposes. The wastewater questionnaire shall include the following information: (1) Name, address and location if different from the address. (2) SIC number according to the Standard Industrial Classification Manual, U.S. Office of Management and Budget, 1972, as amended. (3) Wastewater constituents and characteristics, including but not limited to those shown in subsection 98-161(b)(18). (4) Time and duration of contribution. (5) Average daily and three-minute peak wastewater flow rates, including daily, monthly and seasonal variations if any. (6) Site plans, floor plans, mechanical and plumbing plans and details to show all sewers, wastewater connections and appurtenances by the size, location and elevation. (7) Description of activities, facilities and plant processes on the premises, including all materials which are or could be discharged. (8) Where known, the nature and concentration of any pollutants in the discharge which are limited by the county, state or federal pretreatment standards, and a statement regarding whether or not the discharge standards are being met on a consistent basis and if not, whether additional operation and maintenance and/or additional pretreatment is required for the user to meet applicable discharge standards. (9) If additional pretreatment and/or operation and maintenance will be required to meet the discharge standards, the shortest schedule by which the user will provide such additional pretreatment must be set forth. The completion date in this schedule shall represent a reasonable time frame when considering the circumstances of each individual situation. The following conditions shall apply to this schedule: a. The schedule shall contain increments of progress in the form of dates for the commencement and completion of major events leading to the construction and operation of the pretreatment facilities required for the user to meet the applicable discharge standards (e.g., hiring an engineer, completing preliminary plans, completing final plans, executing contract for major components, commencing construction, completing construction, etc.). b. The completion date for any pretreatment final compliance shall not exceed 12 months. c. Not later than 14 days following each date in the schedule and the final date for compliance, the user shall submit a progress report to the county, including, as a minimum, whether or not it has complied with the increment of progress to be met on such date and, if not, the date on which it expects to comply with this increment of progress, the reason for delay, and the steps being taken by the user to return the construction to the schedule established. (10) Each product produced by type, amount, process or processes and rate of production. (11) Type and amount of raw materials processed (average and maximum per day). (12) Number and type of employees and hours of operation of plant and proposed or actual hours of operation of pretreatment system. (b) The county will evaluate the data furnished by the user and may require additional information.