Rockdale County · Code of Ordinances

Part II - CODE OF ORDINANCES / Part A - GENERAL ORDINANCES / Chapter 98 - UTILITIES / Article III - WASTEWATER SYSTEM / Division 5 - NONDOMESTIC (INDUSTRIAL; COMMERCIAL; INSTITUTIONAL) USE OF PUBLIC WASTEWATER FACILITIES

Sec. 98-166. Discharge permits.

About this text

  • As published by Municode, current through 2026-01-27
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) General.

(1) All industries proposing to connect to or to contribute nondomestic wastewater to the county wastewater system shall apply for a wastewater discharge permit before connecting to or contributing to the county system.

(2) All existing nondomestic wastewater generating industries connected to or contribSupp. No. 7 CD98:39 § 98-166 ROClillALECOUNTYCODE

uting to the county wastewater system shall apply for a wastewater discharge permit.

(3) All permitted users wishing to continue contributing to the county wastewater system beyond the expiration date of the current permit shall apply for a new wastewater discharge permit.

(4) Upon determination by the county, based on information contained in a permit application or other information at its disposal, that a nondomestic user should be issued a permit for its wastewater discharge an industrial user discharge permit shall be issued.

(b) Application. All users required to obtain a wastewater discharge permit shall complete and file with the county an application in the form described by the county and accompanied by a fee as set by the county from time to time. Existing users shall apply for a discharge permit within 60 days of notification by the county that a discharge permit is required. Proposed new users shall make application not less than 90 days prior to connecting to or contributing to the county wastewater system. Permitted users shall make application not less than 60 days prior to the expiration date of the current permit. Each discharge permit application shall be accompanied by a

completed questionnaire as described in section 98-165.

(c) Permit modifications. Each nondomestic user must notify the county at least 60 days in advance of any significant changes to the user's operations or system which might alter the nature, quality or volume of its wastewater, or any other circumstances that may necessitate the issuance of a wastewater discharge permit where one does not

exist, or cause the conditions in its discharge permit to become inaccurate or unrepresentative.

Such changed circumstances include, but are not limited to: significantly altered production practices or processes, plant expansions or reductions or modifications to pretreatment facilities. Then

and in that event, the industry shall apply to the county for a wastewater discharge permit or permit modification, as applicable.

(d) Conditions. Wastewater discharge permits shall be expressly subject to all provisions of this chapter and all other applicable regulations, user charges and fees established by the county.

(1) Wastewater discharge permits issued to industrial users identified as significant must contain the following:

a . Statement of duration;

b. Statement of transferability requirements;

c. Eflluent limits based on applicable general and categorical pretreatment standards, local limits, and state and local law;

d. Self-monitoring, sampling, reporting, notification and record keeping requirements, including an identification of the pollutants to be monitored, sampling location, sampling frequency, and sample type, based

on the applicable general and categorical pretreatment standards, local limits, and state and local law;

and

e. Statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedules may not extend the compliance date beyond applicable federal deadlines.

(2) Wastewater discharge permits may also contain, but need not be limited to, the following:

a. The unit charge or schedule of user charges and fees for the wastewater which is to be discharged by the permittee into the county wastewater system;

b. Limits on the monthly and/or daily average and maximum wastewater constituents and characteristics;

c. Limits on monthly and/or daily average and maximum rate and time of discharge or requirements for flow

regulations and equalization;

d. Requirements for installation and maintenance of inspection and sampling facilities;

e. Specifications for monitoring programs, which may include sampling locations, frequency of sampling,

number, types and standards for tests and reporting schedule;

f. Compliance schedules;

g. Requirements for submission of technical reports or discharge reports (see subsection (h));

h. Requirements for maintaining and retaining plans and records relating to wastewater discharges as specified by the county and affording the county access thereto;

1. Requirements for notification of the county of any new introduction of wastewater constituents or any substantial change in the volume or character of the wastewater constituents being introduced into the county wastewater system;

j. Requirements for notification of accidental discharges as per section 98-169;

k. Requirements for flow monitoring devices;

1. Requirements for certification of pretreatment facility operator; and

m. If sampling performed by an industrial user indicates a violation, user shall notify the county within 24

hours of becoming aware of the violation. User also shall repeat the sampling and analysis and submit

the results of the repeat analysis to the county within 30 days after becoming aware of the violation; and

n. Other conditions as deemed appropriate by the county to ensure compliance with this chapter.

(e) Permit discharge appeals. Any person, including the industrial user, may petition the county to reconsider the terms of a wastewater discharge

permit within 30 days of its issuance.

(1) Failure to submit a timely petition for review shall be deemed to be a waiver of the administrative appeal.

(2) In its petition, the appealing party must indicate the wastewater discharge permit provisions objected to, the reasons for this objection, and the alternative condition, if any, it seeks to place in the wastewater discharge permit.

(3) The effectiveness of the wastewater discharge permit shall not be stayed pending the appeal.

(4) If the county fails to act within 30 days, a request for reconsideration shall be deemed to be denied. Decisions not to reconsider a wastewater discharge permit, not to issue a wastewater discharge permit, or not to modify a wastewater discharge permit, shall be considered final administrative action for purposes of judicial review.

(5) Aggrieved parties seeking judicial review of the final administrative wastewater discharge permit decision must do so by filing a complaint with the superior court for the county within 30 days.

(f) Suspension, revocation or denial.

(1) Procedure. When the director has reason to believe that any one of the conditions enumerated in subsection (2) below exists, he shall give written notice thereof to the permittee. Said notice shall set forth

the time and place where the charges shall be heard by the director of the department of water resources. The hearing date shall not be less than 15 days from

the mailing of such notice by certified mail to the permittee at the address shown on the permit or at permittee's last known address. At the hearing, the permittee § 98-166 ROClillALECOUNTYCODE shall have an opportunity to refute the allegations set forth in the proposed permit revocation notice.

If after the hearing the director finds that any one of the conditions hereinafter enumerated in subsection (2), below, exists, he shall have the right to suspend, revoke

or deny the permit.

(2) Any of the following is reason for permit suspension, revocation or denial:

(3)

a. Failure to notify the county of significant changes to the wastewater prior to the changed discharge;

b. Failure to provide prior notification to the county of changed condition;

c. Misrepresentation or failure to fully disclose all relevant facts in the wastewater discharge permit application;

d. Falsifying self-monitoring reports;

e. Tampering with monitoring equipment;

f. Refusing to allow the county timely access to the facility premises and records;

g. Failure to meet efiluent limitations;

h. Failure to pay fines;

1. Failure to pay wastewater charges;

j. Failure to meet compliance schedules;

k. Failure to complete a wastewater survey or the wastewater discharge permit application;

1. Failure to provide advance notice of the transfer of a permitted facility;

or

m. Violation of any pretreatment standard or requirement, or any terms of the wastewater discharge permit or

the ordinance.

Any user causing immediate endangerment or health risk may be required to immediately cease discharging into the

system.

(4) Wastewater discharge permits shall be voidable upon nonuse, cessation of operations, or transfer of business ownership.

All wastewater discharge permits are void upon the issuance of a new wastewater discharge permit.

(g) Duration. Permits shall be issued for a specified time period as determined by the county, not to exceed three years. A permit may be issued for a period less than a year or may be stated to expire on a specific date. The user shall apply for permit reissuance a minimum of 60 days prior to the expiration of the user's existing permit. The terms and conditions of the permit may be subject to modification by the county during the term of the permit as limitations or requirements as identified in subsection (o)[(f)] above are modified, conditions change, or other just cause exists. The user shall be informed of any proposed changes in his permit at least 30 days prior to the effective date of change. Any changes or new conditions in the permit shall include a reasonable time schedule for compliance.

(h) Transfer. Wastewater discharge permits are issued to a specific user for a specific operation. A wastewater discharge permit shall not be reassigned or transferred or sold to a new owner, new user, different premises, or a new or changed

operation.

(i) Reporting requirements.

(1) (2) Periodic compliance reports. All users who have been issued discharge permits are required to submit compliance reports at the intervals set forth in each user's individual permit. The compliance reports shall address the discharge parameters and all

other information indicated as being necessary to report as shown in the user's permit. This report shall be signed by an

authorized representative of the industrial user.

Baseline report. Within 180 days after the effective date of a categorical pretreatment standard, or 180 days after the final administrative decision made upon a category determination submission under section 98-162, whichever is later, existing industrial users subject to such categoriSupp. No. 7 CD98:42 cal pretreatment standards and currently

discharging to or scheduled to discharge to a POTW shall be required to submit to the county a report which contains the information listed in paragraphs a through g of this subsection. Where reports containing this information already have been submitted to the EPD or EPA in compliance with the requirement of 40 CFR

128.140 (b) (1977), the industrial user will not be required to submit this information again. At least 90 days prior to commencement of discharge, new sources and sources that become industrial users subsequent

to the promulgation of an applicable categorical standard, shall be required to submit to the county a report which contains the information listed in paragraphs a through e of this subsection. New sources

shall also be required to include in this report information on the method of pretreatment the source intends to use to meet applicable pretreatment standards.

New sources shall give estimates of the information requested in paragraphs d and e of this subsection:

a. Identifying information. The user shall submit the name and address of the facility including the name of the operator and owners;

b. Permits. The user shall submit a list of any environmental control permits held by or for the facility;

c. Description of operations. The user shall submit a brief description of the nature, average rate of production, and standard industrial classification of the operations carried out by such industrial user. This description should include a schematic process diagram which indicates points of discharge to the POTW from the

regulated processes;

d. Flow measurement. The user shall submit information showing the measured average daily and maximum daily flow, in gallons per day, to the

POTW from each of the following:

1. Regulated process streams; and § 98-166

2. Other streams as necessary to allow use of the combined waste stream formula of 40 CFR Part

403.6 (e) (See subsection (e) of this section); and

3. The county may allow for verifiable estimates of these flows where justified by cost or feasibility considerations.

e. Measurement of pollutants.

1. The user shall identify the pretreatment standards applicable to each regulated process;

2. In addition, the user shall submit the results of sampling and analysis identifying the nature

and concentration (or mass, where required by the standard or control authority) of regulated pollutants in the discharge from each regulated process. Both daily maximum and average concentration (or mass,

where required) shall be reported. The sample shall be representative of daily operations;

3. Grab samples must be used for pH, cyanide, total phenols, oil and grease, sulfide, and volatile organics. For all other pollutants, 24-hour composite samples must be obtained through flow-proportional composite

sampling techniques where feasible. The control authority may waive flow-proportional composite sampling for any industrial user that demonstrates that

flow-proportional composite sampling is infeasible. In such cases, samples may he obtained through time-proportional composite sampling techniques or through a minimum of four grab

samples where the user demonstrates that this will provide a representative sample of the effluent being discharged;

§ 98-166 ROClillALECOUNTYCODE

4. The user shall take a minimum of one representative sample to compile that data necessary to comply with the requirements of this paragraph;

5. Samples should be taken immediately downstream from pretreatment facilities if such exist or immediately downstream from the regulated process if no pretreatment exists.

If other wastewaters are mixed with the regulated wastewater prior to pretreatment, the user should measure the flows and concentrations necessary to allow use of the combined waste stream formula of section

403.6(e) [40 CFR Part 403.6 (e)] in order to evaluate compliance with the pretreatment standards. Where an alternate concentration or mass limit has been calculated in accordance

with section 403.6(e) [40 CFR Part 403.6 (e)] this adjusted limit along with supporting data shall be submitted to the control authority;

6. Sampling and analysis shall be performed in accordance with the techniques prescribed in 40 CFR Part 136 and amendments thereto. Where 40 CFR Part 136 does not contain sampling or analytical techniques for the pollutant in question, or where the administrator determines that the Part 136 sampling and analytical techniques are inappropriate for the pollutant in question, sampling and analysis shall be performed by using validated analytical methods or

any other applicable sampling and analytical procedures, including procedures suggested by the POTW or other parties, approved by the administrator;

7. The control authority may allow the submission of a baseline report which utilizes only historical data so long as the data provides information sufficient

to determine the need for industrial pretreatment measures;

8. The baseline report shall indicate the time, date and place, of sampling, and methods of analysis, and shall certify that such sampling and analysis is a representative of normal work cycles and expected pollutant discharges to the POTW.

f. Certification. A statement, reviewed by an authorized representative of the industrial user (as defined in section 98-72) and certified to by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and, if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required for the industrial user to meet the

pretreatment standards and requirements;

g. Compliance schedule. If additional pretreatment and/or O&M will be required to meet the pretreatment standards; the shortest schedule by which the industrial user will provide such additional pretreatment and/or O&M. The completion date in

this schedule shall not be later than the compliance date established for the applicable pretreatment standard.

1. Where the industrial user's categorical pretreatment standard has been modified by a removal

allowance (40 CFR Part 403.7), the combined waste stream formula (40 CFR Part 403.6(e)), and/or a fundamentally difference factors variance ( 40 CFR Part 403.13) at the time the

user submits the report re- quired by subsection (i)(2) below, the information required by paragraphs (i)(2)d and e below shall pertain to the modified limits.

2. If the categorical pretreatment standard is modified by a removal allowance ( 40 CFR Part

403. 7), the combined waste stream formula ( 40 CFR Part 403.6(e)), and/or a fundamentally difference factors variance (40 CFR Part 403.13) after the user submits the report required by subsection (i)(2) below, any necessary amendments to the information requested by

subsection (i)(2)d and e below shall be submitted by the user to the control authority within 60 days after the modified limit is approved.

(3) Compliance schedule for meeting categorical pretreatment standards. The following conditions shall apply to the schedule required by subsection (i)(2)g below:

a. The schedule shall contain increments of progress in the form of dates for the commencement and

completion of major events leading to the construction and operation of additional pretreatment required for the industrial user to meet the applicable categorical pretreatment standards (e.g., hiring an engineer,

completing preliminary plans, completing final plans, executing contract for major components, commencing construction, completing construction, etc.).

b. No increment referred to in subsection (i)(2)g below shall exceed nine months.

C.

Not later than 14 days following each date in the schedule and the final date for compliance, the industrial user shall submit a progress report to the control authority includCD98:45

§ 98-166 ing, at a minimum, whether or not it complied with the increment of progress to be met on such date and, if not, the date on which it expects to comply with these increments of progress, the reason for delay, and the steps being taken by the industrial user to return the construction to the schedule established. In no

event shall more than nine months elapse between such progress reports to the control authority.

d. Deadline for compliance with categorical standards. Compliance by existing sources with categorical pretreatment standards shall be

within three years of the date the standard is effective unless a shorter compliance time is specified in the appropriate subpart of 40 CFR chapter I, subchapter N. Direct discharges with NPDES permits modified or

reissued to provide a variance pursuant to Section 301(1)(2) of the Clean Water Act shall be required to meet

compliance dates set in any applicable categorical pretreatment standard. Existing sources which become industrial users subsequent to promulgation of an applicable categorical pretreatment standard shall be considered existing industrial users

except where such sources meet the definition of a new source as defined in 40 CFR Part 403.3(k). New sources shall install and have in operating condition, and shall start-up all pollution control equipment required to meet applicable pretreatment standards before beginning to discharge.

Within the shortest feasible time (not to exceed 90 days), new sources must meet all applicable pretreatment standards.

( 4) All sampling and testing performed under this subsection for reporting requirements shall be conducted in accordance with section 98-164.

(5) If sampling performed by an industrial user indicates a violation, the user shall notify the county within 24 hours of becoming aware of the violation. The user shall also repeat the sampling and analysis and submit the results of the repeat analysis to the county within 30 days

after becoming aware of the violation.

(6) Reports on compliance with categorical pretreatment standard deadlines. Within 90 days following the date for final compliance with applicable categorical pretreatment standards, or in the case of a new source following commencement of the

introduction of wastewater into the POTW, any user subject to such pretreatment standards and requirements shall submit to the county a report containing the information described in subsection (i)(2)d through f. For users subject to equivalent mass or concentration limits established in accordance with the procedures in 40 CFR 403.6(c), this report shall contain a reasonable measure of the user's longterm production rate. For all other users subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production

(or other measure of operation), this report shall include the user's actual production during the appropriate sampling period. All compliance reports must be

signed and certified in accordance with subsection (m).

(7) Reports of changed conditions. Each nondomestic user must notify the county of any planned significant changes to the user's operations or system which might alter the nature, quality, or volume of its wastewater at least 60 days before the change.

a. The county may require the user to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of a wastewater discharge permit application under subsection

(b) above.

b. The county may issue a wastewater discharge permit under subsection (a)(4) above or modify an existing wastewater discharge permit under subsection (c)(l) above in response to changed conditions or anticipated changed conditions.

c. For the purposes of this requirement, significant changes include, but are not limited to, flow increases

of 25 percent or greater, and the discharge of any previously unreported pollutants.

(j) Confidential information.

(1) Information and data on a user obtained from reports, surveys, questionnaires, permit applications, permits, monitoring programs, and from the county's inspection and sampling activities shall be available

to the public without restriction, unless the user specifically requests, and is able to demonstrate to the satisfaction of the county, that the release of such information would divulge information, processes or methods of production entitled to protection as trade secrets under applicable state law. Any such request must be asserted at the time of submission of the information or data.

(2) When requested by the user furnishing a report that such information should be held confidential, the portions of a report which might disclose trade secrets or secret processes shall be made available for inspection by the public, upon receipt by

the county of an open records request as provided by Georgia law with notification to the user by the county of the request and shall also be made available immediately upon request to governmental agencies for uses related to the NPDES program or pretreatment program, and in enforcement proceedings involving the person furnishing the report. Wastewater constituents and characteristics and other "effluent data" as defined by 40 CFR 2.302

will not be recognized as confidential information and will be available to the public without restriction.

(k) Maintenance of records.

(1) Sampling and testing records. Any permitted user subject to the reporting requirements established in subsection (i) shall maintain records of all information resulting from any monitoring activities required by subsection (d). Such records

shall include for all samples:

a. The date, exact place, method, and time of sampling and names of the person or persons taking the samples;

b. The dates analyses were performed;

c. The name of the person(s) who performed the analysis;

d. The analytical techniques/methods used; and

e. The results of such analyses.

(2) Monitoring activities and records of results.

Any permitted user subject to the reporting requirements established in this section shall be required to retain for a minimum of three years any records of

monitoring activities and results (whether or not such monitoring activities are required by this chapter) and shall make such records available for inspection and copying by the city, state or EPA. This period of retention shall be extended during the course of any unresolved litigation regarding the permitted user, or when requested by the county, state or

EPA.

(l) Publication of names of permit violators.

The county shall annually publish in the official organ of the county a list of the users who were significant violators during the 12 previous months. The notification shall also summarize any enforcement actions taken against the user(s) and the user's response to such enforcement actions during the same 12 months.

(m) Application and reports signatories and certification. All wastewater discharge permit applications, questionnaires, and nondomestic user reports must be signed by an authorized representative, as define in subsection 98-72, and contain the following certification statement:

I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance

with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my

inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

History

The history line the source prints at the end of the section.

(Ord. No. 2007-07, § 1, 3-27-2007)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:rockdale-county/code/98-166@2026-01-27-9ee391941f

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.