Skip to content
Georgia Commons
Menu

Rockdale County · Code of Ordinances

Part II - CODE OF ORDINANCES / Part A - GENERAL ORDINANCES / Chapter 98 - UTILITIES / Article I - GENERAL STANDARDS AND DEFINITIONS FOR WATER AND WASTEWATER SYSTEMS / Division 1 - ESTABLISHMENT AND MAINTENANCE OF WATER AND WASTEWATER SERVICES

Sec. 98-9. Sizing and location of water and wastewater lines.

About this text

  • As published by Municode, current through 2026-01-27
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) It being the intent of the county to provide the best possible water and wastewater service

to its customers, affording adequate pressure and supply, and to anticipate and meet future demands placed on the water and wastewater system, all lines constructed and installed by the county or other persons shall meet the following criteria:

(1) Water and wastewater lines to be dedicated to the county shall be installed along public thoroughfares and rights-ofway. The board of commissioners may approve an alternate location upon

determination that a hardship (other than financial) would be created by this requirement.

(2) Water and wastewater lines installed on all existing or future thoroughfares or drainageways shall conform to the current Water and Wastewater System Master Plan on file in the office of the director.

(3) Water and wastewater lines to be installed in new developments shall be sized and constructed as follows:

Residential/Office/Institutional:

Eight-inch water lines on all subdivision through streets. Smaller lines may be authorized on permanent

cul-de-sac streets on a case-by-case basis and at the sole discretion of the director.

Eight-inch sewer lines and six-inch service lines on all streets unless design flow rate and/or slope requires a larger size.

Commercial/Industrial:

Twelve-inch water lines on all streets or rights-of-way.

Eight-inch sewer lines and six-inch service lines on all streets unless design flow rate and/or slope requires a larger size.

(b) When, in the opinion of the director, the pipe size specified in this section that will connect a residential subdivision, development, or user to the water or wastewater system, is larger than would normally be required to serve the

requirements of such subdivision, development, or user, the county may participate financially in the cost to increase the line size upon the

adoption by the board of commissioners of a motion to that effect. Such participation shall be limited to paying the difference in the cost of

material of the size necessary to serve the development and the larger diameter pipe. No other rebates or reimbursements shall be considered

by the county.

History

The history line the source prints at the end of the section.

(Ord. No. 2007-07, § 1, 3-27-2007)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:rockdale-county/code/98-9@2026-01-27-15586b4848

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Rockdale County Code of Ordinances, Sec. 98-9. Sizing and location of water and wastewater lines | Georgia Commons