Schley County · Code of Ordinances
Part - CODE OF ORDINANCES / Chapter 12 - FLOOD DAMAGE PREVENTION / Article IV - PROVISIONS FOR FLOOD HAZARD REDUCTION
Sec. 12-102. Specific standards.
About this text
- As published by Municode, current through 2021-09-21
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
In all areas of special flood hazard, the following provisions are required:
(1) New construction and substantial improvements. Where base flood elevation data are available, new construction or substantial improvement of any structure or manufactured home shall have the lowest floor, including basement, elevated no lower than one foot above the base flood elevation. Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate equalization of flood hydrostatic forces on both sides of exterior walls shall be provided in accordance with standards of section 12-101(4).
(2) Nonresidential construction. New construction or the substantial improvement of any structure located in A1-30, AE, or AH zones may be floodproofed in lieu of elevation.
The structure, together with attendant utility and sanitary facilities, must be designed to be watertight to one foot above the base flood elevation, with walls substantially
impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A registered professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the
provisions above, and shall provide such certification to the official as set forth above and in section 12-71(6).
(3) Standards for manufactured homes and recreational vehicles. Where base flood elevation data are available:
a. All manufactured homes placed or substantially improved on individual lots or parcels, in new or substantially improved manufactured home parks or subdivisions, in expansions to existing manufactured home parks or subdivisions, or on a site in an existing manufactured home park or subdivision where a manufactured
home has incurred substantial damage as the result of a flood, must have the lowest floor, including basement, elevated no lower than one foot above the base flood elevation.
b. Manufactured homes placed or substantially improved in an existing manufactured home park or subdivision may be elevated so that either:
1. The lowest floor of the manufactured home is elevated no lower than one foot above the level of the base flood elevation; or
2. The manufactured home chassis is elevated and supported by reinforced piers (or other foundation elements of at least an equivalent strength) of no less than 36 inches in height above grade.
c. All manufactured homes must be securely anchored to an adequately anchored foundation system to resist flotation, collapse and lateral movement as described in section 12-101(6).
d. All recreational vehicles placed on sites must either:
1. Be fully licensed and ready for highway use (a recreational vehicle is ready for highway use if it is licensed, on its wheels or jacking system, attached to the site only by quick disconnect type utilities and security devices, and has no permanently attached structures or additions); or
2. Meet all the requirements for new construction, including the anchoring and elevation requirements of subsection (3)a through c of this section.
(4) Floodway. Located within areas of special flood hazard established in section 12-3 are areas designated as floodways. A floodway may be an extremely hazardous area due to
velocity floodwaters, debris or erosion potential. In addition, the area must remain free of encroachment in order to allow for the discharge of the base flood without increased flood heights. Therefore, the following provisions shall apply:
a. Encroachments are prohibited, including earthen fill, new construction, substantial improvements or other development within the regulatory floodway. Development may be permitted however, provided it is demonstrated through hydrologic and hydraulic analyses performed in accordance with standard engineering practice that the encroachment shall not result in any increase in flood levels or
floodway widths during a base flood discharge. A registered professional engineer must provide supporting technical data and certification thereof.
b. Only if subsection (4)a of this section is satisfied, then any new construction or substantial improvement shall comply with all other applicable flood hazard reduction provisions of this article.
History
(Ord. No. 11102004, art. 4, § B, 11-16-2004)