Schley County · Code of Ordinances
Part - CODE OF ORDINANCES / Chapter 14 - MOBILE HOMES / Article III - PRE-OWNED MANUFACTURED HOMES
Sec. 14-101. Permitting, inspection, certificate of occupancy and fees.
About this text
- As published by Municode, current through 2021-09-21
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
A permit shall be required to locate a pre-owned manufactured home in the jurisdiction. All permits shall be issued within ten days of receipt of all items listed in subsections (1) through (3) of this section.
(1) Permit. To obtain a permit, Applicants shall provide to the building inspector:
a. An affidavit signed by the applicant that the pre-owned manufactured home meets health and safety standards required by this Act;
b. Photographs of the interior and exterior of the pre-owned manufactured home providing evidence that home meets the minimum health and safety standards of section 14-102;
c. Applicant shall arrange for an inspection of the pre-owned manufactured home by the building inspector at its current location prior to the pre-owned manufactured home being moved into the county.
(2) Fee. A permit and inspection fee in amounts as determined by the board of commissioners from time to time shall be charged to the applicant to cover the cost to the county to process the permit application and inspect the pre-owned manufactured
home. Such fee shall cover the initial inspection and one follow up inspection. The applicant shall be charged $50.00 for each additional inspection that may be necessary.
In the event that the building inspector is required to travel more than 60 miles one way from the board of commissioners' office in Ellaville, Schley County, Georgia, the applicant shall pay an additional $0.55 per mile (mileage rate is current IRS allowable rate and any modifications thereto) above 60 miles for such inspection.
(3) Certificate of occupancy. A certificate of occupancy shall be issued to the applicant at such time that the building inspector certifies that the requirements of this article have been met.
History
(Ord. No. 11192010, § 3, 11-19-2010)