--- title: Screven County Code of Ordinances, Sec. 58-33. Termination of access site collection: local-codes id: local-code:screven-county/code/58-33 cite_as: Screven County, Ga., Code of Ordinances § 58-33 canonical_url: https://georgiacommons.org/counties/screven/code/58-33 md_url: https://georgiacommons.org/counties/screven/code/58-33.md text_url: https://georgiacommons.org/counties/screven/code/58-33/text source_url: https://library.municode.com/ga/screven_county/codes/code_of_ordinances date: 2021-06-08 status: active jurisdiction: county:screven jurisdiction_name: Screven County county_fips: "13251" corpus_version: local-codes-screven-county-2b0bc20e62f7 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/screven/code/~part-ii/~chapter-58/~article-ii.md previous: https://georgiacommons.org/counties/screven/code/58-32.md next: https://georgiacommons.org/counties/screven/code/58-34.md index: https://georgiacommons.org/counties/screven.md branch: code edition: As published by Municode, current through 2021-06-08 edition_date_kind: current_through source_publisher: Municode version_id: local-code:screven-county/code/58-33@2021-06-08-0bf5a8c9dd --- # Screven County Code of Ordinances, Sec. 58-33. Termination of access site > As published by Municode, current through 2021-06-08 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 58 - ROADS AND BRIDGES / Article II - TIMBER HARVESTING (a) At the conclusion of the harvesting operation, the foreman or supervisor in charge thereof shall notify the public works director, or his designee, that the harvesting operation is complete and request an inspection of the access site to determine if there has been any damage to the road or right-of-way as a result of the harvesting operation. Damages caused by the harvesting operation shall be repaired by the harvesting person within 15 days or, if necessary, by the county or a contractor of the county's choice, at the expense of the person responsible therefor. (b) Culverts installed and utilized in the harvesting operation may be removed, provided that the road right-of-way shall be restored to the same condition existing prior to the installation of the culvert. ## History (Ord. No. 92-02, § III, 11-12-1991)