(a) At the conclusion of the harvesting operation, the foreman or supervisor in charge thereof shall notify the public works director, or his designee, that the harvesting operation is complete and request an inspection of the access site to determine if there has been any damage to the road or right-of-way as a result of the harvesting operation. Damages caused by the harvesting operation shall be repaired by the harvesting person within 15 days or, if necessary, by the county or a contractor of the county's choice, at the expense of the person responsible therefor. (b) Culverts installed and utilized in the harvesting operation may be removed, provided that the road right-of-way shall be restored to the same condition existing prior to the installation of the culvert.