Neither the planning commission nor the board of commissioners shall approve a subdivision or major development in a location where the existing roads providing primary access are inadequate to serve the additional traffic generated by the development. Where existing roads are inadequate to serve the additional traffic, the planning commission and board of commissioners shall require paved access to the subdivision or major development from an existing paved county road or state or federal highway. All construction cost and right-of-way acquisition to construct the road to DOT standards with a minimum 60-foot right-of-way shall be the responsibility of and be paid for by the developer. The BOC shall approve the DOT standard used and give final approval after construction is completed. If the ditches on existing county roads are to be used for drainage from the subdivision, major development, or road improvement, the developer shall regrade such ditches and provide an all-weather drainage outlet. All regarding and drainage outlets shall be approved by the board of commissioners or its authorized representatives.