Sec. 26-221. Requirements.

About this text

  • As published by Municode, current through 2011-03-15
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Any individual, partnership, corporation or any other entity (hereinafter called "Harvester") who harvests standing timber in any unincorporated area of the County for delivery as pulpwood, logs, poles, posts or wood chips to any wood yard or processing plant located inside or outside this state will be required to perform the following:

(1) The harvester shall obtain a timber harvesting permit from the Seminole County Board of Commissioner's office prior to start-up (moving in of equipment or cutting of any trees). Said notification will be on such permit form as approved and provided by the board of commissioners.

(2) The harvester shall post an annual cash bond, surety bond or irrevocable letter of credit as provided for in this paragraph, in the amount of $5,000.00. The purpose of the bond is to insure that all damages to roadways, ditches, or rights-of-way be corrected and said areas left at least in the same condition as existing immediately prior to the operations start-up. Notice shall not be or remain effective for such harvesting operations unless and until the person or firm providing such notice has delivered to the governing authority or its designated agent a valid surety bond, executed by a surety corporation authorized to transact business in this state, protecting the county against any damage caused by harvester.

(3) In order to preserve county roadways, some job sites may require the installation of a temporary entrance/exit driveway. The determination for such a driveway will be made by the county road department superintendent. The county shall loan the harvester the driveway culvert pipe necessary to build the driveway. The harvester must install the driveway pipe and provide soil and any other necessary materials to bring the ingress/egress point to build a reliable driveway. No roadside ditches can be filled in to provide the ingress/egress. A culvert pipe must be used to prevent the blockage of stormwater. At the conclusion of harvesting the site, the harvester will notify the county commissioner's office and the county road department will remove and retain the pipe.

(4) If the harvester fails to return the roadways, ditches or rights-of-way to a state at least equal to that existing immediately prior to the instituting of the harvesting process, the Board of Commissioners of Seminole County shall cause the repairs to be made and deduct the costs for the same from the posted bond.

(5) If the harvester causes no damages and/or upon his satisfactory completion of necessary repairs, the bond shall be released to the harvester at year end following inspection of all sites by the county road department superintendent. Harvester shall notify the county tax assessors' office of actual completion date on each site.

History

The history line the source prints at the end of the section.

(Ord. of 3-15-2011, § 1)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:seminole-county/code/26-221@2011-03-15-8cd80e1a84

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.