No road will be accepted for county maintenance unless the provisions of this article have been met. The approval of the plans required by section 42-63 constitutes no implied responsibility on the county for any assistance in construction, either in materials, labor or equipment, these being entirely the responsibility of the developer. Specifically, the developer will move, at his cost, all utility lines and poles, install all required drainage facilities, install all culverts for access to abutting property, construct the roadway and improve the entire right-of-way. The county's approval of the plans required by section 42-63 shall in no way obligate the county to pave or resurface the road at the time of construction or at a future date. Paving shall be done at the discretion of the board of commissioners.