--- title: Seminole County Code of Ordinances, Sec. 50-46. Major subdivision procedure collection: local-codes id: local-code:seminole-county/code/50-46 cite_as: Seminole County, Ga., Code of Ordinances ยง 50-46 canonical_url: https://georgiacommons.org/counties/seminole/code/50-46 md_url: https://georgiacommons.org/counties/seminole/code/50-46.md text_url: https://georgiacommons.org/counties/seminole/code/50-46/text source_url: https://library.municode.com/ga/seminole_county/codes/code_of_ordinances date: 2011-03-15 status: active jurisdiction: county:seminole jurisdiction_name: Seminole County county_fips: "13253" corpus_version: local-codes-seminole-county-ac59fbf4a9a7 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/seminole/code/~part-ii/~chapter-50/~article-ii.md previous: https://georgiacommons.org/counties/seminole/code/50-45.md next: https://georgiacommons.org/counties/seminole/code/50-47.md index: https://georgiacommons.org/counties/seminole.md branch: code edition: As published by Municode, current through 2011-03-15 edition_date_kind: current_through source_publisher: Municode version_id: local-code:seminole-county/code/50-46@2011-03-15-14fefc207a --- # Seminole County Code of Ordinances, Sec. 50-46. Major subdivision procedure > As published by Municode, current through 2011-03-15 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 50 - SUBDIVISIONS / Article II - SUBDIVIDING PROCEDURE (a) Preliminary plat approval. Any applicant seeking preliminary plat approval for a major subdivision shall submit to the county administrative officer an appropriate number of copies of the preliminary plat along with an executed formal application. (b) Preliminary plat requirements. The preliminary plat for a major subdivision shall include the following information: (1) Proposed subdivision name and total acres. Subdivision names shall not duplicate the name of any other subdivision in the county. (2) Name of owner of subdivision. (3) The names of owners of all adjacent land contiguous to the proposed subdivision. (4) A vicinity map showing the relative location of the proposed subdivision. (5) Proposed street names, right-of-way and roadway width. (6) Location of utility and drainage easements. (7) Lot lines, lot and block numbers (consecutively numbered or lettered), lot sizes, area in parks, etc. (8) Topographic maps of all land subdivided, with scale and contour interval as deemed appropriate by the planning commission and board of commissioners. (9) Minimum building setback lines. (10) Numerical scale, graphic scale, north arrow, and date. (11) All elevations shall be based on sea level datum. (12) Soil characteristics, including soil types and capabilities, frequency and evaluations of seasonal high groundwater tables, occurrence of rock, and other impervious strata where the subdivision is not to be served by a public or community sewerage system. This should be superimposed on the plat. (13) Plans for control of erosion and sedimentation. (14) Location of all water supplies on or off the subdivision which will bear upon the location of the on-site sewage management systems. (15) Delineation on plat of all wetlands and 100-year regulatory floodplains. (16) If state department of transportation approval and permits are required, submit a copy of the department's approval letter and permit. (17) Site reservation for garbage dumpsters, with ten or more lots as needed. (18) Health department statement of approval of all lots. The county commission may waive the requirements of this section which are determined not needed. Where, in the judgement of the planning commission, any requirements under this section are determined as not necessary, the planning commission and board of commissioners may recommend the waiver of such requirements. (c) County commission action. (1) A complete application for a major subdivision shall be acted upon within 45 days of the date of such submission, or within such further time as may be consented to by the developer. Otherwise, the county commission shall be deemed to have approved the subdivision plat. (2) Final plat approval shall be granted or denied within 45 days after submission of a complete application or within such time as may be consented by the applicant. Failure of the county commission to act within the period prescribed shall constitute final approval. (3) Final approval shall expire within 90 days from the date of the signing of the plat by the county commission chair and clerk of the county unless within such period the plat shall have been duly filed for recording by the developer within the office of the clerk of superior court of the county. (4) No subdivision plat shall be accepted for filing by the superior court until it has been approved by the county commission chair as indicated on the instrument by the signature of the county commission chair and county clerk. The signatures of the county commission chair and county clerk shall not be affixed until the developer has posted the guarantees required to have granted final plat approval. (d) Effect of preliminary plat approval. Preliminary plat approval for a major subdivision shall confer upon the applicant the following rights for a three-year period from the date of the preliminary approval: (1) The general terms and conditions on which preliminary approval was granted shall not be changed; (2) The applicant may submit for final approval on or before the expiration date of preliminary approval, the whole or sections of the preliminary subdivision plat; and (3) The applicant may apply for and the county commission may grant an extension on such preliminary approval for a specified time period. (e) House numbers/street addresses. House numbers and street addresses shall be assigned by the county after preliminary plat approval for a major subdivision. (f) Final plat approval. (1) An applicant seeking final plat approval of a major subdivision shall submit to the county an appropriate number of copies of the final plat. The final plat shall be accompanied by a statement from the county engineer that the county is in receipt of as-built plans showing all streets, drainage and retention facilities and utilities in exact location and elevation and identifying those portions already installed and those to be installed, and/or certified in the amount of performance guarantees required to ensure completion of those improvements not yet installed. (2) Final plat approval of a major subdivision shall be granted or denied within 45 days after submission of a complete application to the administrative officer, or within such time as may be consented to by the applicant. Failure of the county commission to act within 45 days shall constitute final approval. (3) Final approval of a major subdivision shall expire 90 days from the date of the signing of the plat by the county commission chair and county clerk unless within such period the plat shall have been duly filed by the developer within the clerk of superior court. (4) No subdivision plat shall be accepted for filing by the clerk of superior court until it has been approved by the county commission as indicated on the plat by the signature of the county commission chair and county clerk. (g) Final plat requirements. The final plat for a major subdivision shall: (1) Conform to the preliminary plat as approved. (2) Be a professional drawing at a size which is suitable for filing in the land records of the county. (h) Final plat contents. The final plat for a major subdivision shall contain the following information: (1) Primary control points and benchmarks with necessary descriptions and locations of such control points, including all dimensions, angles, bearings and similar data necessary for proper location. (2) Tract boundary lines, right-of-way lines of streets, easements and other right-of-way and property lines of residential lots and other sites; with accurate dimensions, bearings of deflection angles, radii and area and central angle of all curves. (3) Names and right-of-way of each street or other right-of-way. (4) Location, dimensions and purpose of easement. (5) Number or letters to identify each lot. (6) Purpose for which sites, other than residential lots, are dedicated or reserved. (7) Minimum building setback lines on all lots and other sites. (8) Location and description of monuments. (9) Name of record owners of adjoining property owners. (10) Reference to recorded subdivision plats of adjoining platted land by record names, data and number. (11) Certification by a registered surveyor or registered engineer to accuracy of survey and plat. (12) Declaration of land ownership. (13) Title, numerical scale, graphic scale, north arrow, and date. (14) A statement, either directly on the plat or in an identified attached document of private covenants, if any. (15) A copy of the deeds for dedications of public areas to the board of commissioners. (i) Certificate of final subdivision approval. Upon final approval of a major subdivision by the county commission chair, the county clerk shall inscribe on the plat the following: Pursuant to the Land Subdivision Ordinance of Seminole County, Georgia, all the requirements of approval having been fulfilled, this final plat was given final approval by: The County Commission on day of , 20 . _________________________________________ Clerk _________________________________________ County Commission Chairman, Seminole County (j) Streets, easements, alleys, etc. The approval of a final plat under this section by the county commission and its subsequent recording does not constitute acceptance by the county of any street, easement, alley or other grounds shown on the plat. This will be done by formal dedication and by acceptance resolution of the county commission. (k) Bonds and requirements. To ensure the adequacy and integrity of materials, construction and installation of public facilities and improvements, i.e., streets, drainageways and other infrastructure, the developer shall post a bond or certified check with the county clerk. Such bond or certified check shall provide for and secure to the county a guarantee that the actual construction and installation requirements of the county have been met, and that a two-year maintenance and performance period shall be met. (1) Required bond. The bond shall be with a surety company licensed to do business in the state and acceptable to the county attorney. It shall contain a provision indemnifying the county for the maintenance of installations and improvements required by this article in the subdivision for two years following the date of final approval. The county engineer shall determine the amount of the bond which shall be adequate to cover any failures of the improvements and drainage system. (2) Bond submission. Maintenance and/or performance bonds shall be submitted to the county prior to the approval of the final plat and is a prerequisite for the acceptance of any such final plat for review and consideration. (3) Release of bond. The bond shall be released after an additional inspection by the county engineer indicates that all paving, drainage and other improvements have proven satisfactory and have withstood the two-year test period.