The duties of the field representative shall include, but not be limited to, the following: (1) Review all development permits to determine that the permit requirements of this division have been satisfied. (2) Advise the permittee that additional federal or state permits may be required, and if specific federal or state permit requirements are known, require that copies of such permits be provided and maintained on file with the development permit. (3) Review all development permits to determine if the proposed development adversely affects the flood-carrying capacity of the floodplain. For purposes of this division, the term "adversely affects" mean damage to adjacent properties because of rises in flood states attributed to physical changes of the channel and the adjacent overbank areas. a. If it is determined that there is no adverse effect, and the development is not a building, then the permit shall be granted without further consideration. b. If it is further determined that there is an adverse effect, then technical justification, i.e., a registered professional engineering analysis, for the proposed development shall be required. c. If the proposed development is a building, then the provisions of this division shall apply.