Application for a development permit shall be made to the field representative on forms furnished by him prior to any development activities and may include, but not be limited to, the following plans in duplicate drawn to scale showing the nature, location, dimensions, and elevations of the area in question; existing or proposed construction, fill, storage of materials, drainage facilities; and, the location of the foregoing. Specifically, the following information is required: (1) Application stage. The applicant shall provide the following: a. Elevation in relation to mean sea level of the lowest floor, including the basement, of all proposed structures. b. Elevation in relation to mean sea level to which any nonresidential structure will be floodproofed. c. Certification by a registered professional engineer or architect that the nonresidential floodproofed structure meets the floodproofing criteria in section 38-92(2). d. Description of the extent to which any watercourse will be altered or relocated as a result of the proposed (2) Construction stage. In the construction stage, the following shall be provided: A flood elevation or floodproofing certification after the lowest floor is completed. Within 21 calendar days of establishment of the lowest floor elevation, or floodproofing by whatever construction means, or upon placement of the horizontal structural members of the lowest floor, whichever is applicable, it shall be duty of the permit holder to submit to the field representative a certification of the elevation of the lowest portion of the horizontal structural members of the lowest floor, whichever is applicable, as built, in relation to mean sea level. Such certification shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same. When floodproofing is utilized for a particular building, such certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same. Any work done within the 21-day calendar period and prior to submission of the certification shall be at the permit holder's risk. The field representative shall review the flood elevation survey data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further progressive work being permitted to proceed. Failure to submit the survey or failure to make such corrections required hereby, shall be cause to issue a stop work order for the project.