--- title: Stephens County Code of Ordinances, Sec. 66-181. Lot sizes and proportions collection: local-codes id: local-code:stephens-county/code/66-181 cite_as: Stephens County, Ga., Code of Ordinances § 66-181 canonical_url: https://georgiacommons.org/counties/stephens/code/66-181 md_url: https://georgiacommons.org/counties/stephens/code/66-181.md text_url: https://georgiacommons.org/counties/stephens/code/66-181/text source_url: https://library.municode.com/ga/stephens_county/codes/code_of_ordinances date: 2026-09-08 status: active jurisdiction: county:stephens jurisdiction_name: Stephens County county_fips: "13257" corpus_version: local-codes-stephens-county-788b55145d06 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/stephens/code/~part-code-of-ordinances/~chapter-66/~article-vi.md previous: https://georgiacommons.org/counties/stephens/code/66-150-to-66-180.md next: https://georgiacommons.org/counties/stephens/code/66-182.md index: https://georgiacommons.org/counties/stephens.md branch: code edition: As published by Municode, current through 2026-09-08 edition_date_kind: current_through source_publisher: Municode version_id: local-code:stephens-county/code/66-181@2026-09-08-cf4dd84172 --- # Stephens County Code of Ordinances, Sec. 66-181. Lot sizes and proportions > As published by Municode, current through 2026-09-08 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part - CODE OF ORDINANCES / Chapter 66 - SUBDIVISIONS / Article VI - DESIGN STANDARDS FOR BLOCKS AND LOTS (a) Residential lots shall meet the lot width and lot area requirements of any existing zoning ordinance and/or those specified for lot size based on slope. (b) Lot size requirements are as follows for single family dwellings including but not limited to: manufactured or mobile homes, stick built homes, modular homes, etc., and individual lots in subdivisions or mobile home lots located in areas other than commercial mobile home parks. Area requirements for multiple dwellings on a single recorded lot, where not prohibited by local zoning, must be provided in multiples of the following minimum lot sizes for each dwelling to be constructed on the recorded lot. See Table MT-1 and subsections (1) through (6) as follows. Table MT-1 Minimum (Min.) Lot Sizes, Minimum Lot Widths and Maximum (Max.) Allowable Sewage Flow for the Type of Water Supply System. Type of Water Supply System Non-Public* (Individual) Public Min. Lot Size 43,560 sq. ft. 43,560 sq. ft. Min. Lot Width 150 ft. 100 ft. Max. Sewage Flow 600 gpad** 100 gpad * In this context "non-public" means an individual water supply system or any other water supply system which is not a "public" water supply system. ** gpad=gallons per acre per day=gal/acre/day. (1) The above minimum lot sizes are for the typical size home (three or four bedroom) with basic appurtenances such as: driveway, minimum number of trees, and water supply line. If larger homes, swimming pools, tennis courts or outbuildings, etc. are proposed to be constructed or if trees would interfere with installation of an onsite sewage management system, the county board of health will require larger lots to assure useable soil area. (2) The county board of health may also require larger lot sizes when physical factors indicate the need to do so. These factors include, but are not limited to, the availability of sufficient unobstructed land areas for an approved on-site sewage management system and approved replacement system, slope greater than five percent, percolation rates higher than 45 minutes per inch, need for subsurface drainage or adverse topographic features. (3) Lots shall be a minimum width of 100 feet or 150 feet measured within the area where an approved on-site sewage management system and replacement system are to be located when served by a public water supply system or non-public water supply system respectively. (4) All residential lots must contain at least 21,780 square feet of usable soil area for individual sewage disposal. (5) There must be an unobstructed area on each lot for installation of an approved on-site sewage management system and an area equal in size for a conventional system or larger area, as appropriate, for an approved replacement system; this will include sufficient area for necessary site modifications for installation of both the initial system and a replacement system. All pertinent county zoning set-backs and other space requirements must also be met. (6) The maximum daily sewage flow for each lot or parcel of land shall not exceed 600 gpad when served by non-public or individual water supply system of 1,200 gpad when served by public water supply system. When sewage flows exceed these quantities (600 or 1,200 gpad as indicated) for a given dwelling structure, the minimum lot size or parcel of land shall be increased proportionately. Example: Assume a public water supply exists (so 1,200 gpad maximum sewage flow allowed per minimum required land area of 21,780 square feet), and there is a proposed sewage flow of 5,000 gpd. To determine X= the square footage of the lot needed, use the following formula: X= 5,000 gal/day 1,200 gal/acre/day X= 4.17 acres. X= 4.17 acres x 43,560 sq. ft./acre. X= 181,500 sq. ft. area of land needed. Likewise, for a non-public (individual) water supply, to determine Y= the square footage of the lot needed for a proposed sewage flow of 5,000 gpd, use the following formula: Y= 5,000 gal/day 600 gal/acre/day Y= 8.33 acres. Y= 8.33 acres x 43,560 sq. ft./acre. Y= 363,000 sq. ft. area of land needed. Minimum (Min) Lot Sizes, Minimum Lot Widths and Maximum (Max) Allowable Sewage Flow for the Type of Water Supply System. Type of Water Supply System Non-Public* (Individual) Public Min. Lot Size 43,560 sq. ft. 43,560 sq. ft. Min. Lot Width 150 ft. 100 ft. Max. Sewage Flow 600 gpad** 1,200 gpad * In this context "non-public" means an individual water supply system or any other water supply system which is not a "public" water supply system. ** gpad=gallons per acre per day=gal/acre/day. (c) Commercial and industrial lots shall be adequate to provide a service area and off-street parking suitable to the use intended. (d) Residential corner lots shall have an adequate width to meet building setback requirements from both abutting streets. (e) The minimum setback for buildings shall be 40 feet from right-of-way lines and a minimum of ten feet from the side property lines. All property lines are considered side property lines except those adjoining right-of-way lines. (f) The minimum setback for buildings for properties with frontage on Lake Hartwell shoreline property owned by the U.S. Army Corps of Engineers shall be 40 feet from the right-of-way lines, ten feet from any side line and five feet from the property line abutting Lake Hartwell shoreline property owned by the U.S. Army Corps of Engineers. All property lines are considered side property lines except those adjoining right-of-way lines and those adjoining Lake Hartwell shoreline property owned by the U.S. Army Corps of Engineers. ## History (Ord. of 4-4-1995, § 701; Ord. No. 04-01, § 3, 4-5-2004; Ord. of 8-9-2011(2))