(a) Height. Amateur tower height, location and other technical specifications shall comply with federal and state law. Amateur towers shall not exceed 120 feet. Amateur tower permits shall be issued conditioned upon the tower being used solely for non-commercial purposes and no commercial wireless communications facilities may be collocated thereon (notwithstanding the provisions of 47 USC ยง 1455(a)). (b) Setbacks. A distance equal to the height of the tower shall separate new amateur radio towers from all structures not located on the same parcel as the tower, property lines, rightof-way lines and/or easements. Any relocation of amateur radio towers shall remain on same parcel and must comply with stated chapter setback requirements, or, if compliance is not possible, the relocation must not increase the amount by which setbacks are nonconforming, other than increases necessitated solely by changes in size of the base to support the new tower. The setback waiver form from all adjoining land owners with structures within the applicable setbacks will waive these setback requirements. (c) Application requirements. All permit (Level I) applications for amateur radio towers shall contain the following: (1) One original and two copies of a survey of the property completed by a registered professional engineer, licensed in the State of Georgia or a tax map showing all existing uses, structures, and improvements as well as proposed structure and setbacks and the setback waiver form if applicable. (2) A copy of an active FCC amateur license and statement that the structure will only be utilized for amateur radio purposes. (3) Any applicant for facilities under this section shall certify that such proposed facility shall comply with all applicable federal regulations, and that the proposed facility will not be used for commercial purposes in any form. (4) A copy of an active FCC amateur license and statement that the structure will only be utilized for amateur radio purposes. (5) Any applicant for facilities under this section shall certify that such proposed facility shall comply with all applicable federal regulations, and that the proposed facility will not be used for commercial purposes in any form.