Temporary PWSF permit shall be issued conditioned upon the following specifications: (1) It will be in place for no more than 60 days. (2) It requires notification of construction to the FAA. (3) It does not require marking or lighting by the FAA. (4) It will be less than 200 feet in height. (5) It does not involve any excavation (or excavation where prior disturbance exceeds proposed excavation by at least two feet). Application requirements. All permit (Level 1) applications for TEMPORARY PWSF shall contain the following: (1) Completion of the �temporary tower application.� (2) Application fee. (3) Description of proposed location, type of temporary structure, duration of proposed location not to exceed 60 days (subject to a one-time extension of an additional 60 days for good cause), type of electrical service to be utilized, description of temporary necessity requiring temporary PWSF.