(a) Height. Non-exempt OTARD tower height, location and other technical specifications shall comply with federal and state law. Non-exempt OTARD towers eligible for Level 1 permitting shall not exceed 120 feet. Non-exempt OTARD Level 1 tower permits shall be issued conditioned upon the tower being used solely for OTARD purposes and the applicant and landowner shall certify that no commercial wireless communications facilities will be collocated thereon (notwithstanding the provisions of 47 USC ยง 1455(a)). (b) Setbacks. A distance equal to the height of the tower shall separate new non-exempt OTARD towers from all structures not located on the same parcel as the tower, property lines, rightof-way lines and/or easements. Any relocation of OTARD towers shall remain on same parcel and must comply with stated chapter setback requirements, or, if compliance is not possible, the relocation must not increase the amount by which setbacks are nonconforming, other than increases necessitated solely by changes in size of the base to support the new tower. The setback waiver form from all adjoining land owners with structures within the applicable setbacks will waive the setback requirements. (c) Application requirements. All permit (Level I) applications for non-exempt OTARD towers shall contain the following: (1) One original and two copies of a survey of the property completed by a registered professional engineer, licensed in the State of Georgia or a tax map showing all existing uses, structures, and improvements as well as proposed structure and setbacks and the setback waiver form if applicable. (2) A statement that the structure will only be utilized for OTARD purposes. (3) Any applicant for facilities under this section shall certify that such proposed facility shall comply with all applicable federal regulations, and that the proposed facility will not be used for any other commercial purposes in any form. (4) One original and two copies of construction drawings showing the proposed structure and setbacks. (5) Any applicant for facilities under this section shall certify that such proposed facility shall comply with all applicable federal regulations, and that the proposed facility will not be used for any other commercial purposes in any form. (6) One original and two copies of construction drawings showing the proposed structure and setbacks.