Sec 34-105. Report. Stormwater management report shall contain the following: (a) A Georgia licensed professional engineer seal, signature, and date; (b) Engineer's phone, email, address and fax; (c) Developer's name, phone, email, address and fax; (d) Militia district; (e) Tax parcel(s); (f) Date of preparation; (g) Narrative explaining the purpose of the report; (h) An executive summary of the report's findings organized similar to the provided below; (i) Prior to approval of the report, the applicant shall certify and provide documentation that all other applicable environmental permits (wetland, septic, etc,) have been acquired for the site; ENVIRONMENT Sec 34-105 (j) All wetland reports, buffers, and permits shall be submitted with report: NPDES general permit for construction (Ga EPD); ACOE 404 Permit (wetlands); Georgia EPD stream buffer variance; Special permits (GDOT, easements, etc.). (k) Provide a table of contents and either provide page numbers or tabs referencing sections for the following: Executive summary; Hydrology calculations, tables, summaries, etc.; Water quality (if applicable); Floodplain delineation; Environmental permits; Details of outlets, dams, or any applicable structure or condition; Cross sections of creeks, ponds, outlets, etc., where applicable; Maps pre, post, basin area, floodplain, etc.; Annotated checklists; Ten percent downstream analysis; Appendix; Design engineer is to provide site review tool for BMPs in report; Other data as may be required. (l) Below is a chart show acceptable mythology [methodology] different applications. TABLE 2-1 Methods for Runoff Computation Computation Task GSMM Chapter Rational Formula SCS USGS Equations Water Quality Volume Size Limitations for Each Method 25 acres 25 to 2,000 acres 2,000 acres to 25 square miles Based on Structural Control Water Quality Volume (WQv ) 1.3 X Channel Protection Volume (Cpv ) 1.3 X Overbank Flood Protection (Qp25) 1.3 X X Extreme Flood Protection (Qf ) 1.3 X X Storage Facilities 2.2 X X Outlet Structures 2.3 X X Gutter Flow and Inlets 4.2 X Storm Drain Pipes 4.2 X X X Culverts 4.3 X X X Small Ditches 4.4 X X X Open Channels 4.4 X X Energy Dissipation 4.5 X X Source: Georgia Stormwater Management Manual, Volume II, p. 3.1-2. Flow summary. SCS methodology or approved other (approval must be in writing by county engineer) (All basins must have an individual pre and postdeveloped analysis) • Basin, return frequency two-, five-, ten-, 25-, 50- and 100-year events • Predeveloped flow at property line for each basin for each event; • Postdeveloped flow at property line for each basin for each event; • (Postdeveloped flow at property line must be less than or equal to predeveloped flow) Any concentrated flows or flows shall have a downstream drainage easement. º Routed flow; º Bypass flow. Times of concentration summary. • Subarea; • Pre-post overland flow, minutes; • Pre-post shallow concentrated flow, minutes; • Pre-post open channel flow, minutes; • Predeveloped Tc, minutes; Curve number summary. • Subarea; • Predeveloped curve number with all calculations and supporting documentation; • Postdeveloped curve number with all calculations and supporting documentation; • For the site, use predeveloped CN less than or equal to 55 unless approved by this office. Postdeveloped flows at every location where runoff will leave the development must be less than or equal to predeveloped flows. Gutter spread calculations summary. Gutter spread shall be measured from the face-of-curb. Inlets and catch basins shall be placed to limit the spread to the following: • Local streets (25 mph or less)—50 percent of travel lane feet plus gutter at low section where inlets are on both sides of road and 75 percent of travel lane plus gutter on standard inlets, but in no case should be more that eight feet on side of the street. • Collector and arterial roads—Less than 50 percent outside travel lane plus gutter. • All inlets should show Q bypass, Q in, contributing area, Tc, flow path, etc.