Skip to content
Georgia Commons
Menu

Sumter County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 58 - RESIDENTIAL, COMMERCIAL, AND INDUSTRIAL DEVELOPMENTS / Article II - PLATS / Division 3 - FINAL PLAT

Sec. 58-114. Final plat requirements.

About this text

  • As published by Municode, current through 2026-03-17
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

The final plat shall conform to and meet the specifications of the preliminary plat and the following additional specifications. The original final plat shall be clearly and legibly drawn in permanent ink on reproducible copy paper or other reproducible media at the following minimum scale:

1—4 acre tract: 100 feet to the inch.

5—10 acre tract: 200 feet to the inch.

Over 10 acre tract: 500 feet to the inch.

Blue-lined copies of the original plat will be accepted. Original sheet sizes shall be 24 × 36 inches; and where more than one sheet is required, an index map shall be provided on the same size sheet. The final plat shall show:

(1) Bearings and distances of the subdivision boundaries to the nearest existing street lines or other permanent monuments (not less than three) accurately described on the plat.

(2) Municipal, county and land lot lines accurately tied to the boundary lines of the subdivision by distance and angles

when such lines traverse or are reasonably close to the subdivision.

(3) Exact boundary lines of the tract, determined by a field survey, giving distances to the nearest tenth of a foot and angles to the nearest minute, which

shall be balanced and closed with an error of closure not to exceed 1:5,000.

(4) Name of the subdivision and the exact location, widths and names of all streets and alleys within and immediately adjoining the plat.

(5) Street centerlines showing angles of deflection, angles of intersection, radii and lengths of tangents.

(6) Lot lines with dimensions to the nearest tenth of a foot.

(7) Lots numbered in numerical order.

(8) Location, dimensions, and purposes of any easements and any areas to be

reserved or dedicated for public use.

(9) Accurate location, material and description of monuments and markers.

(10) A statement, either directly on the plat or in an identified attached document, of any private covenants.

(11) The actual location of all utility easements.

(12) The following certifications:

a. A surveyor’s certification, directly on the final plat as follows:

It is hereby certified that this plat is true and correct and was prepared

from an actual survey of the property by me or under my supervision; that all monuments shown thereon actually exist and their location, size, type and material are correctly

shown; and that all requirements of the Land Subdivision Regulations of Sumter County, Georgia, have been fully complied with.

By: ______________ Registered C. E.

No. ______________ or By: ______________ Registered Georgia Land Surveyor No. ______________

b. An Owner’s Certification, directly on the final plat as follows:

Owner’s Certificate State of Georgia, County of Sumter.

The owner(s) of the land shown on this plat and whose name(s) are subscribed hereto, in person or through a duly authorized agent, certifies that this plat was made from an actual survey, that all state and county taxes or other assessments now due on this land have been paid.

Agent ___________ Date ____________ Owner ___________ Date ____________

c. Certificate of dedication. A certificate by the owner setting forth the

description of the areas and improvements dedicated to the public and the extent of the title should be

attached to the final plat. Because of the legal consideration, this certificate shall be approved as to form by the county attorney.

d. A certificate of approval of the final plat by the county commission,

directly on the plat, as follows:

Pursuant to the Land Subdivision Regulations of Sumter County Georgia, all the requirements of approval having been fulfilled, this final plat was approved by the Sumter County Commission on , 20 .

________________ (date) ________________ Chairman Sumter County Commission (Ord. of 9-19-06)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:sumter-county/code/58-114@2026-03-17-8a78642e5c

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Sumter County Code of Ordinances, Sec. 58-114. Final plat requirements | Georgia Commons