(a) Prior to the approval of the final plat, an agreement shall have been reached between the subdivider or his agent and the county government with regard to the installation of street improvements and utilities called for on the subdivision plat. (b) Prior to the approval of the final plat, the subdivider shall be required to have installed by the appropriate county agency at his expense or, with approval of the agency concerned, to himself install the following street improvements and utilities: (1) All street rights-of-way shall have ditches and tail ditches as required by the soil conservation requirements and by the county standard specifications for roads and streets. (2) Where sanitary sewage facilities are available, sanitary sewer lines and manholes installed. (3) When public water supply is available, water mains within the subdivision with fire hydrants and with connections to each lot. Minimum diameter of water pipes shall normally be six inches. (c) All required street improvements, utilities and monuments shall be built to standards specified by the agency responsible for each. All utilities to be installed in the streets shall be placed and the soil shall be compacted prior to paving.