--- title: Tattnall County Code of Ordinances, Sec. 34-102. Groundwater recharge areas protection regulations collection: local-codes id: local-code:tattnall-county/code/34-102 cite_as: Tattnall County, Ga., Code of Ordinances § 34-102 canonical_url: https://georgiacommons.org/counties/tattnall/code/34-102 md_url: https://georgiacommons.org/counties/tattnall/code/34-102.md text_url: https://georgiacommons.org/counties/tattnall/code/34-102/text source_url: https://library.municode.com/ga/tattnall_county/codes/code_of_ordinances date: 2025-04-07 status: active jurisdiction: county:tattnall jurisdiction_name: Tattnall County county_fips: "13267" corpus_version: local-codes-tattnall-county-d7f11833b871 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/tattnall/code/~part-ii/~chapter-34/~article-v.md previous: https://georgiacommons.org/counties/tattnall/code/34-101.md next: https://georgiacommons.org/counties/tattnall/code/34-103.md index: https://georgiacommons.org/counties/tattnall.md branch: code edition: As published by Municode, current through 2025-04-07 edition_date_kind: current_through source_publisher: Municode version_id: local-code:tattnall-county/code/34-102@2025-04-07-7fa43eabd6 --- # Tattnall County Code of Ordinances, Sec. 34-102. Groundwater recharge areas protection regulations > As published by Municode, current through 2025-04-07 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 34 - HEALTH AND SANITATION / Article V - ON-SITE SEWAGE MANAGEMENT (a) Findings of fact. Recharge areas are vulnerable to urban development activities as well as agricultural activities. Pesticides and herbicides sprayed on crops and animal waste, like septic tank effluents, contribute to a deterioration in the groundwater quality and can threaten the health of residents relying on well water. Development usually means an increase in the amount of land covered with impervious surfaces. Paving land in recharge areas can alter or impair their recharge characteristics thereby decreasing groundwater supplies. (b) Reference map. The official map for delineation of significant groundwater recharge areas in the county to be regulated areas under this article is the state department of natural resources' "Significant Recharge Areas, Hydrological Atlas 18 (1989 edition)." (c) Groundwater recharge areas development permit requirements. All uses except those identified in subsection (d) of this section and those subject to further restriction by any underlying zoning district are allowed. The following are additional requirements for specific uses: (1) All new above ground chemical or petroleum storage tanks, having a minimum volume of 660 gallons, shall have secondary containment for 110 percent of the volume of such tanks or 110 percent of the volume of the largest tank in a cluster of tanks, and shall otherwise meet the requirements of U.S. EPA rules for oil pollution prevention, 40 CFR 112.1. Such tanks used for agricultural purposes are exempt, provided they comply with all federal requirements. (2) All single-family dwellings, multi-family dwellings, mobile home parks, or other uses located within a groundwater recharge area and not served by both public water and sewer systems shall be required to have 150 percent of the minimum lot or space size calculated based on application of the state department of human resources manual for on-site sewage management systems (DHR manual) tables MT-1 and MT-2 (included in section 34-107). The minimums set forth in tables MT-1 and MT-2 may be increased further based on consideration of other factors (set forth in sections A—F) of the DHR manual. Said minimum lot size shall not be in any case less than the minimum lot size specified by any underlying zoning district. The regulations specifying the largest minimum lot size shall apply. (3) All lots shall have a minimum width of 150 feet, or as specified in any underlying zoning district if stricter (larger), in the area where an approved on-site sewage management system is to be located. (4) No construction may proceed on a building or mobile home to be served by a septic tank or other on-site sewage management system unless the county health department first approves the proposed on-site sewage management system installation as meeting the requirements of the state department of human resources manual for on-site sewage management systems and the provisions of this article. (5) All new wastewater treatment basins shall have an impermeable liner except for the construction of mining settling basins. (6) All new agricultural waste impoundment sites shall be lined. As a minimum, the liner shall be constructed of compact clay having a thickness of one-foot and a vertical hydraulic conductivity of less than 5 × 10-7 cm/sec or other criteria established by the U.S. natural resources conservation service. (d) Prohibited uses. The following uses are prohibited entirely and no permit shall be issued for them: (1) All new hazardous waste storage, treatment and disposal facilities. (2) New facilities handling 10,000 pounds or more of hazardous materials of the types listed in section 312 of the Resource Conservation and Recovery Act of 1976, as amended, excluding underground storage tanks, on any one day. (3) Permanent stormwater infiltration basins. ## History (Ord. of 9-10-2001, § 7)