--- title: Tattnall County Code of Ordinances, Sec. 68-45. Drainage collection: local-codes id: local-code:tattnall-county/code/68-45 cite_as: Tattnall County, Ga., Code of Ordinances § 68-45 canonical_url: https://georgiacommons.org/counties/tattnall/code/68-45 md_url: https://georgiacommons.org/counties/tattnall/code/68-45.md text_url: https://georgiacommons.org/counties/tattnall/code/68-45/text source_url: https://library.municode.com/ga/tattnall_county/codes/code_of_ordinances date: 2025-04-07 status: active jurisdiction: county:tattnall jurisdiction_name: Tattnall County county_fips: "13267" corpus_version: local-codes-tattnall-county-d7f11833b871 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/tattnall/code/~part-ii/~chapter-68/~article-iii.md previous: https://georgiacommons.org/counties/tattnall/code/68-44.md next: https://georgiacommons.org/counties/tattnall/code/68-46.md index: https://georgiacommons.org/counties/tattnall.md branch: code edition: As published by Municode, current through 2025-04-07 edition_date_kind: current_through source_publisher: Municode version_id: local-code:tattnall-county/code/68-45@2025-04-07-659cbc95f9 --- # Tattnall County Code of Ordinances, Sec. 68-45. Drainage > As published by Municode, current through 2025-04-07 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 68 - SUBDIVISIONS / Article III - SUBDIVISION DESIGN AND SPECIFICATIONS (a) For minor subdivisions: All roads must be brought up to an elevation at least 12 inches above the 100 year flood plain, be equipped with proper drainage pipes, including driveway and ramp pipes, and have drainage easements and out-fall ditches as needed. All cross drains shall contain a minimum of 32 feet of approved pipe of a size sufficient to provide for proper drainage. All drainage pipes must be concrete or double wall ADS. The county engineer must approve road elevations, drainage plan, drainage structures, cross drains and out-fall ditches before installation. (b) For major subdivisions: All roads and lots must be brought up to an elevation at least 12 inches above the 100 year flood plain. All roads must be equipped with proper drainage structures, including storm drains. Drainage easements, retention ponds, and outfall ditches should be in place if necessary. The county engineer must approve road elevations, drainage plan, and drainage structures before installation. ## History (Ord. of 9-8-2014, art. IV, § 4.5)