Skip to content
Georgia Commons
Menu

Towns County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 10 - BUILDINGS AND BUILDING REGULATIONS / Article V - BUILDING PERMITS

Sec. 10-170. Permit application.

About this text

  • As published by Municode, current through 2019-07-26
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

When required, any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical, or plumbing system, the installation of which is regulated by the technical codes, or to cause any such work to be done, shall first make application to the building official and obtain the required permit for the work.

History

The history line the source prints at the end of the section.

(Ord. of 9-21-2006(3), § 3.1.1; Ord. of 2-21-2008, § 8)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:towns-county/code/10-170@2019-07-26-7197c37d78

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.