--- title: Towns County Code of Ordinances, Sec. 10-220. Required collection: local-codes id: local-code:towns-county/code/10-220 cite_as: Towns County, Ga., Code of Ordinances § 10-220 canonical_url: https://georgiacommons.org/counties/towns/code/10-220 md_url: https://georgiacommons.org/counties/towns/code/10-220.md text_url: https://georgiacommons.org/counties/towns/code/10-220/text source_url: https://library.municode.com/ga/towns_county/codes/code_of_ordinances date: 2019-07-26 status: active jurisdiction: county:towns jurisdiction_name: Towns County county_fips: "13281" corpus_version: local-codes-towns-county-81967969b927 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/towns/code/~part-ii/~chapter-10/~article-vi.md previous: https://georgiacommons.org/counties/towns/code/10-219.md next: https://georgiacommons.org/counties/towns/code/10-221.md index: https://georgiacommons.org/counties/towns.md branch: code edition: As published by Municode, current through 2019-07-26 edition_date_kind: current_through source_publisher: Municode version_id: local-code:towns-county/code/10-220@2019-07-26-b5346278de --- # Towns County Code of Ordinances, Sec. 10-220. Required > As published by Municode, current through 2019-07-26 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 10 - BUILDINGS AND BUILDING REGULATIONS / Article VI - INSPECTIONS The building official upon notification from the permit holder or his agent shall make the following inspections and as many inspections as necessary until the building official is satisfied that the technical codes have been met, and shall either release that portion of the construction or shall notify the permit holder or his agent of any violations which must be corrected in order to comply with the technical code: (1) Building. a. Foundation inspection is to be made after trenches are excavated and forms erected. b. Frame inspection is to be made after the roof, all framing, fire blocking and bracing are in place, all concealed wiring, all pipes, chimneys, ducts and vents are complete. c. Final inspection is to be made after the building is completed and ready for occupancy. (2) Electrical. a. Underground inspection is to be made after trenches or ditches are excavated, conduit or cable installed, and before any backfill is put in place. b. Rough-in inspection is to be made after the roof, framing, fire blocking and bracing is in place and prior to the installation of wall or ceiling membranes. All branch circuit wiring is in place for all receptacles and lighting outlets, all feeders pulled to panel. c. Final inspection is to be made after the building is complete, all required electrical fixtures are in place and properly connected or protected, and the structure is ready for occupancy. (3) Plumbing. (Note that required tests shall be as stated in the county's plumbing code.) a. Underground inspection is to be made after trenches or ditches are excavated, piping installed, and before any backfill is put in place. b. Rough-in inspection is to be made after the roof, framing, fire blocking and bracing is in place and all soil, waste and vent piping is complete, DWV and water tests are in place, and prior to this installation of wall or ceiling membranes. c. Final inspection is to be made after the building is complete, all plumbing fixtures are in place and properly connected, and the structure is ready for occupancy. (4) Mechanical. a. Underground inspection is to be made after trenches or ditches are excavated, underground duct and fuel piping installed, and before any backfill is put in place. b. Rough-in inspection is to be made after the roof, framing, fire blocking and bracing are in place and all ducting, and other concealed components are complete, and prior to the installation of wall or ceiling membranes. c. Final inspection is to be made after the building is complete, the mechanical system is in place and properly connected, and the structure is ready for occupancy. (5) Gas. a. Rough piping inspection is to be made after all new piping authorized by the permit has been installed, test placed on piping and before any such piping has been covered or concealed or any fixtures or gas appliances have been connected. b. Final piping inspection is to be made after all piping authorized by the permit has been installed and after all portions which are to be concealed by plastering or otherwise have been so concealed, and before any fixtures or gas appliances have been connected. This inspection shall include a pressure test. c. Final inspection is to be made on all new gas work authorized by the permit and such portions of existing systems as may be affected by new work or any changes in order to insure compliance with all the requirements of this Code and to ensure that the installation and construction of the gas system is in accordance with reviewed plans. (6) Energy. a. Foundation inspection is to be made before slab concrete is poured in place. To verify that perimeter insulation has been installed correctly on any slab on grade foundations, if required. b. Frame inspection is to be made before exterior wall insulation is concealed by wall board to check installation of exterior walls insulation and to inspect that all holes and cracks through the structure envelope have been sealed in an appropriate manner as to restrict air passage. c. Final inspection is to be made after the building is completed and ready for occupancy. To verify installation and R-value of ceiling and floor insulation. To verify correct SEER ratings on appliances. ## History (Ord. of 9-21-2006(3), § 3.8)