Skip to content
Georgia Commons
Menu

Towns County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 10 - BUILDINGS AND BUILDING REGULATIONS / Article VII - CERTIFICATES

Sec. 10-256. Certificate of occupancy.

About this text

  • As published by Municode, current through 2019-07-26
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Required; inspections required for issuance. A new building shall not be occupied or a change made in the occupancy, nature or use of a building or part of a building until after the building official has issued a certificate of occupancy. Said certificate shall not be issued until all required electrical, gas, mechanical, plumbing and fire protection systems have been inspected for compliance with the technical codes and other applicable laws and ordinances and released by the building official.

(b) Issuance. Upon satisfactory completion of construction of a building or structure and installation of electrical, gas, mechanical and plumbing systems in accordance with the technical codes, reviewed plans and specifications, and after the final inspection, the building official shall issue a certificate of occupancy stating the nature of the occupancy permitted, the number of persons for each floor when limited by law.

(c) Temporary/partial occupancy. A temporary/partial certificate of occupancy may be issued for a portion of a building, which may be safely occupied prior to final completion of the building.

(d) Existing building certificate. A certificate of occupancy for any existing building may be obtained by applying to the building official and supplying the information and data necessary to determine compliance with the technical codes for the occupancy intended. Where necessary, in the opinion of the building official, two sets of detailed drawings, or a general inspection, or both, may be required. When, upon examination and inspection, it is found that the building conforms to the provisions of the technical codes and other applicable laws and ordinances for such occupancy, a certificate of occupancy shall be issued.

(e) Requirements for issuance. To obtain a certificate of occupancy the following is required:

(1) Satisfactory completion of all required inspections;

(2) Payment of any outstanding fees;

(3) Installation of permanent and proper address numbers in accordance with the E-911 plan.

History

The history line the source prints at the end of the section.

(Ord. of 9-21-2006(3), § 3.9)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:towns-county/code/10-256@2019-07-26-4e8fc80b41

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.