Turner County · Code of Ordinances
Part II - CODE / Chapter 18 - BUILDINGS AND BUILDING REGULATIONS / Article III - BUILDING CODES
Sec. 18-72. Conformity with article regulations; permits required.
About this text
- As published by Municode, current through 2010-11-02
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
No buildings, structures, or land shall be used or occupied, and no building, structure or part thereof shall be erected, constructed, reconstructed, moved, enlarged, or structurally altered unless in conformity with the regulations of this article. All contractors, builders or landowners shall be required to purchase permits before any construction within the county shall begin. Georgia Power, county EMC, or any other electrical supplier shall not connect or supply any building, structure or manufactured home with power until an electrical permit has been issued.
History
(Res. No. 2000-01-02, 1-20-2000)
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.