--- title: Turner County Code of Ordinances, Sec. 34-72. Permit procedures collection: local-codes id: local-code:turner-county/code/34-72 cite_as: Turner County, Ga., Code of Ordinances ยง 34-72 canonical_url: https://georgiacommons.org/counties/turner/code/34-72 md_url: https://georgiacommons.org/counties/turner/code/34-72.md text_url: https://georgiacommons.org/counties/turner/code/34-72/text source_url: https://library.municode.com/ga/turner_county/codes/code_of_ordinances date: 2010-11-02 status: active jurisdiction: county:turner jurisdiction_name: Turner County county_fips: "13287" corpus_version: local-codes-turner-county-ef52ec4ba9b8 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/turner/code/~part-ii/~chapter-34/~article-ii/~division-3.md previous: https://georgiacommons.org/counties/turner/code/34-71.md next: https://georgiacommons.org/counties/turner/code/34-73.md index: https://georgiacommons.org/counties/turner.md branch: code edition: As published by Municode, current through 2010-11-02 edition_date_kind: current_through source_publisher: Municode version_id: local-code:turner-county/code/34-72@2010-11-02-034c57e4c4 --- # Turner County Code of Ordinances, Sec. 34-72. Permit procedures > As published by Municode, current through 2010-11-02 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE / Chapter 34 - FLOODS / Article II - FLOOD DAMAGE PREVENTION / Division 3 - ADMINISTRATION Application for a development permit shall be made to the building official on forms furnished by the community prior to any development activities, and may include, but not be limited to the following: plans in duplicate drawn to scale showing the elevations of the area in question and the nature, location, dimensions, of existing or proposed structures, earthen fill placement, storage of materials or equipment, and drainage facilities. Specifically, the following information is required: (1) Application stage. a. Elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all proposed structures; b. Elevation in relation to mean sea level to which any non-residential structure will be floodproofed; c. Design certification from a registered professional engineer or architect that any proposed non-residential floodproofed structure will meet the floodproofing criteria of section 34-92(2); d. Description of the extent to which any watercourse will be altered or relocated as a result of a proposed development; and (2) Construction stage. For all new construction and substantial improvements, the permit holder shall provide to the building official an as-built certification of the regulatory floor elevation or floodproofing level immediately after the lowest floor or floodproofing is completed. Any lowest floor certification made relative to mean sea level shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same. When floodproofing is utilized for non-residential structures, said certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same. Any work undertaken prior to submission of these certifications shall be at the permit holder's risk. The building official shall review the above referenced certification data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further progressive work being allowed to proceed. Failure to submit certification or failure to make said corrections required hereby, shall be cause to issue a stop-work order for the project. ## History (Ord. No. 2009-08-01, 8-10-2009)